Loading...
CF-Cozby Library-LR 940707J G EOTECHNICAL E GEE Consultants, Inc. E J NVIRONMENTAt' -. 2540 Glenda Lane · Suite 108 · Dallas, Texas 75229 · (214) 620-9791 · Fax (214) 620-9794 REPORT OF IN-PLACE DENSITY AND MOISTURE OF SOIl. Method: ASTM D2922 D3017 D698 Page 1 of 1 Client: City of Coppeil Malerial Dcacriotion Maximum Optimum Dry. Moisture Dcnsi .ty Con~nt Project: W.T. Cozby Library (Lbs,'CuF0 Percent Test Date: June 16, 1994 - REVISED 1. Dark Gray Clayey Sand 101.5 18.9 Report Date: July 7, 1994 2. Required Density (%): 95% to 105% 3. Required Moisture (%): +3% Optimum 4. Mat Location/Elevation (and/or) Lift In-Place In-Place Percent No. Dry.' Density Moisture Compaction Test No. (Lbs/CuFt) Conlent (%) Probe Depth 2 Utility ditch, 1' lift, sewer line 89 105.4 20.1 103.8 6" 35' north of northeast corner of the building 2 Utility ditch, 2"a lift, sewer line 90 106.9 16.0 105.3 6' 65' north of northeast corner of the building 2 Utility ditch, 3"~ lift, sewer line 91 109.1 17.9 107.5 6" 50' north of northeast corner of the building 2 Utility ditch, 4'~ lift, sewer line 92 108.5 18.9 106.9 6" 60' north of northeast corner of the building 2 Utility ditch. 5'b lift, sewer line 93 105.3 18.9 103.8 6" 30' north of northeast corner of the building 1 Utility ditch, final lift, sewer line 94 102.2 18.0 90.9* 6' 6' north of center entryway pavement * Under sidewalk area cc: Gary Sieb - City of Coppell Jim ~k - F ~ S Partners Larry Davis - City of Coppell R0~ W~lliatas//-, Brockette Davis Drake, Inc. Mike Sherpinskas - Diversified Construction Services, Inc. 6./~/4~ (~/.~/ Our letters and reports are for the exclusive use of the' client to whom they are addressed. The use of our name must receive our prior written approval. Our letters and reports apply only to the sample tested and/or inspected, and are not necessarily indicative of the quantities of apparently identical or similar products.