GENERAL REPORT
Report Date July 20, 1994 Inspection Date July 14, 1994
General Report No.21
Client City of Coppell
Project W.T. Cozby Library
Coppell, Texas
Identification Reinforcing Steel Inspection
Method of Test Visual Inspection Page #1 of 1
Results
On July 14, 1994, a representative of GEE Consultants, Inc. was present at the above
referenced project to perform visual inspection of structural steel reinforcing at the following
locations:
Leave out Slab
C-12 to C-13
C-13 to E-13
E-13 to E-12
E-12 to C-12
No discrepancies were noted.