MA1009-CS130918 Rhonda Adloo From:Kyle Dykes <KDykes@TNPINC.com> Sent:Wednesday, September 18, 2013 1:20 PM To:John Elias Cc:Keith Marvin; Niraj Acharya Subject:RE: Andy Brown Ph2 - Revised Cost Opinion & Contract Amendment 1 John, I just wanted to check on the status of the scope and fee amendment, and to see if you have any questions. We are happy to proceed with the revised wall option (all wall), if in fact that decision has been made. Please let us know if Niraj or myself can assist in any way. Thanks Kyle Dykes, P.E., CFM StormWaterGroup 1100 Macon Street Fort Worth, Texas 76102 817.336.5773 Main 817.665.7171 Direct kdykes@tnpinc.com From: Kyle Dykes Sent: Friday, September 06, 2013 4:53 PM To: John Elias Cc: 'Keith Marvin'; Niraj Acharya Subject: Andy Brown Ph2 - Revised Cost Opinion & Contract Amendment 1 John, As discussed in our 60% review meeting the other day, attached is a revised cost opinion for building wall around the entire lake. Also attached is a contract amendment for the additional scope of work that would be required. The 13.7% fee increase correlates closely with the 16% of additional project length. Two items of note: The amendment does take into account the remaining survey budget, and the amendment does not include any additional time for redesigning Segment’s 2 and 3. I have provided the amendment in order to expedite the remaining design work. If upon your review of the revised cost opinion the City decides to stick with the current design and project limits, please disregard the amendment. Thanks for meeting with us and have a great weekend. Let me know if you have any questions or require additional information. Kyle Dykes, P.E., CFM StormWaterGroup 1100 Macon Street Fort Worth, Texas 76102 817.336.5773 Main 1 817.665.7171 Direct kdykes@tnpinc.com 2