CF-Cozby Library-LR 940719I G EOTECHNJCAL ENGINEERING GEE Consultants, Inc. 2540 Glenda Lane · Suite lOg ° Dallas, Texas 75229 ° (214) 620-9791 · Fax (214) 620-9794 GENERAL REPORT Report Date July 19, 1994 Inspection Date July 15, 1994 Client City of Coppell Project W.T. Cozby Library Coppell, Texas Identification Shop Inspection @ Weebe Industries - Fort Worth, Texas Method of Test Visual Inspection Page #! of 1 Results On luly 15, 1994, a representative of GEE Consultants, Inc. was present at the above referenced fabrication plant to pertbrm visual inspection of fabricated structural steel: 1. Four tube trusses, piece mark #27TI have been completed with the exception of painting. One weld was tbund to have been omitted. The area was marked up for rewelding. 2. One truss #27TI which was being welded out was found to have no root opening at the bottom chord splice joint prep which had been fitted. We requested that a root opening be formed by grinding. 3. 5-28T1 and 4-28T2 galvanized truss assemblies have been shipped to job site prior to our inspection. An inspection will be performed of these members at the project site. 4. Tubular truss assembly field splice preps had beveled ends but the tube ends were not provided with fitted backing bars, which is a requirement for a ,Cull penetration splice weld. The fabricator stated that corrections would be made. 5. Tube beams with bent plates, piece mark #23B1, 23B2, 23B3 and 23B4 are in various stages of fabrication. 6. Random dimensional checks were made and were satisfactory. 7. Shop welds were visually examined tbr size and appearance. In enera w ' /'h g I eldmg and workmanship is progressing in a satisfactory m~a~o[l /.~ur inspection was performed in accordance with project drawings and specifications. cc: W Gary Sieb - City of Coppell Russell illiams - Brockette Davis Dralce, Inc. Larry Davis - City of Coppell Jim Bullock - F & S Partners Mike Sherpinskas - Diversified Construction Services, Inc.