Keith,
Attached is the CAD base that shows design linework, survey shots, topo, etc… I did notice that the existing toe shots
from about station 1+00 to 2+00 are slightly below the proposed footing. This means fill will be required to bring the
finished grade to the top of the first course, as shown on the detail. The remaining 600 feet appear to be at or above
the proposed finished grade.