Loading...
MA1009-CS130806 Rhonda Adloo From:Kyle Dykes <KDykes@TNPINC.com> Sent:Tuesday, August 06, 2013 2:29 PM To:Keith Marvin Subject:Alex Canal survey - CAD base Attachments:BASE BLOCK.DWG Keith, Attached is the CAD base that shows design linework, survey shots, topo, etc… I did notice that the existing toe shots from about station 1+00 to 2+00 are slightly below the proposed footing. This means fill will be required to bring the finished grade to the top of the first course, as shown on the detail. The remaining 600 feet appear to be at or above the proposed finished grade. Kyle Dykes, P.E., CFM StormWaterGroup 1100 Macon Street Fort Worth, Texas 76102 817.336.5773 Main 817.665.7171 Direct kdykes@tnpinc.com 1