Loading...
CF-Cozby Library-LR 940726E GEE Consultants, Inc. 2540 Glenda Lane · Sui~ 10g · Dallas, lexas 75220 · (214) 620-9791 · [ax {214) 620-9794 GENERAL REPORT Report Date July 26, 1994 Inspection Date July 21, 1994 General Report No.22 Client City of Coppell Project W.T. Cozby Libr~ Coppell, Texas Identification Field Inspection Method of Test Visual Inspection Page #1 of I Results On July 21, 1994, a representative of GEE Consultants, Inc. was present at the above referenced project to perform the following services: 1. At this time the north portion of the building has been erected from grid-lines C to J and from line gl to #13.- 2. Roof joist and joist girder seats are being welded ia place. The metal deck is now being installed and puddle welded inplace. '"' 3. Pipe column #C31 at grid J6 has two upper wing plates welded on the wrong side. The~se will be removed and rewelded on the correct sides. 4. Perimeter deck angle at line J between line #12 and #13 had incorrect spacing of stitch welds. The welds were at approximately 36" centers, drawing details call tbr 3" of weld 12" on center. 5. We requested the welders qualifications but they were not present at this time. 6. The above items were brought to the attention of the erection foremen as well as the job superintendent. Our inspection was performed in accordance with a project drawings and spe~to, ll cc: Gary Sieb - City of Coppell Jim Bullock - F & S Partners Larry Davis - City of Coppell Russell Williams - Brockette Davis Drake, Inc. Mike Sherpinskas - Diversified Construction Services, Inc.