Loading...
CF-Cozby Library-LR 940726 (2)I G E GEE Consultants, Inc. 2540 Glenda Lane · Suite 108 · Dallas, lexas 75220 · (214) 620-0791 · Fax (214) 620-9794 GENERAL REPORT Report Date July 26, 1994 Inspection Date July 22, 1994 General Report No.23 Client City of Coppell Project W.T. Cozby Library Coppell, Texas Identification Shop Inspection at Weebe Industries-Fort Worth, Texas Method of Test Visual Inspection Page #1 of 1 Results On July 22, 1994, a representative of GEE Consultants, Inc. was present at the above referenced fabrication plant to perform visual inspection of fabricated structural steel. 1. Five ~8TI and tbur g28T2 curved tresses which have been returned to the fabricator were inspected. The 28Tl's have gutter openings through the side of tube. These openings according to the project drawings are in the fight location as detailed. We request an engineering review of this detail to resolve any questions. 2. The last of the two tress structures #35T1 and 36T1 are being worked. Backing bars are being fitted at the ends for the field splice connections. 3. We noted that a number of rolled beams are being thermally heated in spots to remove excessive roll, we recommended the use of temp sticks to better control the amount of heat input. 4. A truck is currently being loaded for shipment. The load consists of rolled beams, tube beams with bent plate and other pieces. 5. According to the fabricator, approximately 33 % of the structural steel has been fabricated. 6. Ship welds were visually examined tbr size and appearance. In general welding and workmanship is progressing in a satisfactory manor. C)m'} inspect,j/on was performed in accordance with project d raw in gs and spec iff cations. //l'li~t4ff~ cc: Gary Sieb - City of Coppell Jim Bullock - F & S Partnet:~*t~'' - -'""' Larry Davis - City of Coppell Russell Williams - Brockette Davis Drake, Inc. Mike Sherpinskas - Diversified Construction Services, Inc.