Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
CF-Cozby Library-LR 940726 (5)
E GEE Consultants, Inc. 2540 Glenda Lane · Suite 108 · Dallas, lexas 75220 · (214) 620-0791 · Fax (214) $20-9794 REPORT OF CONCRETE MIX INSPECTION Report Date: July 26, 1994 Date Concrete Placed: JuLY 15, 1994 Sta.da~d 6'x12" Client: City of Coppell Ar~a 28.27 Square Inches Project: W.T. Cozby Public Library ConcrateReportNo.25 Contractor: Diversified Construction Services, Inc. Concrete Supplier and Plant: Texas Industries, Inc. - Plant #41 Location of Placemcnt: Leave out Slab (west end) MATERIALS ~:' s~D a,,~ w~. ~io, ,L~,.-cuYd~ INSPECTION DATA Mix Number: 45 Time Sample Batched: 12:57 pm Cement: 4.5sk Time Sampled: 02:00 pm Sample Location: C:I3-E:I3-E:I2-C:i2 (10' ii of W end) Fly Ash: TmcWTicket No: 95/242597 Coars~ Aggregate: 1' C.S. Temperature: Intermediate Aggregate: Ambient Range: 96°F 1:ine Aggregate: Concrete Range: 95°1: Admixtures: Slump Rang~ (inches): Weather Conditions: Partly Cloudy I Admix Time Started: 12:30 pm 2 Time Completed: 02:50 pm Added Water: 15 gal. Sample Air Content (~): No Test Total Cubic Yards Placed: 9.0 C.Y. Required Strangth (Lbs./sq.in.): 3,000 $1x~im=n Mr.a~ut~d A~ Da~ To, al L~ad Ccsnp~siv~ St~-n~th R~nar~ Number $1unAv dn.i ( Da_,,s ~ T=.st~d ~Lba.; il..b~.:Sq.ln.l WTC 121 6 7 07/22/94 92,240 3,260 WTC 122 6 7 07/22/94 91,840 3,250 WTC 123 6 28 08/12/94 WTC 124 6 28 08/12/94 WTC 125 6 Hold Hold T~I M¢ilauds Utili~ Fractu~ nSrM C-3LC-30, C-~a~ :c~ s~ Oe,~,i~ Cylinders Made By: J. R. Remarks and/or Distribution: cc: Gary Slab - City of Coppell Larry Davis - City of Coppell Mike Sherpinskas - Diversified Construction Services, Inc. Jim Bullock - F & S Partners Russell Williams - Brockette Davis Drake, Inc.,.A/~ (tR~ ~on,.alt:m~t,. Z~. Reviewed by: /~~~