CF-Cozby Library-LR 940705 (2)I G
E GEE Consultants, Inc.
2540 Glenda Lane · Suite 10g · Dallas, lexas 75229 · (214) 620-9791 · Fax (214) 620-9794
REPORT OF CONCRETE MIX INSPEC ON
Report Date: July 5, 1994 Date Concrcte Placed: June 27, 1994 Standard 6'x12'
Client: City of Coppell Area 28.27 Square Inches
Project: W.T. Cozby Public Library Concrete Report No.24
Contractor: J.L. Burney
Concrete Supp[ierand Plant: Texas Industries, Inc. - Plant #41
Location of Placement: Slab 1st Floor (east end}
MATERIALS so~=., ssa a,,~wu. INSPECTION DATA
DescGption (Lbt;CuYd ~
Mix Number: 45 Time Sample Berthed: 6:26 am
Cement: 4.55k Time Sampled: 7:01 am
Sample Location: 9.5' S, 50' W. Ng-corner of Buildling
Fly Ash: TruckfI%ket No: 90;134934
Coars~ Aggregate: I" C.S. Temperature:
Intermediate Aggregate: Ambient Range:
Fin= Aggregate: Concrete Range:
Admixtures: Slump Range (inches):
Weather Conditions: Clear
I Admix Time Started: 6:15 am
2 Time Completed: 12:30 pm
Added Water: 20 gal. Sample Air Content (%): No T~st
Total Cubic Yards Placed: 30.0 C.Y.
Required Strength Ckbs./sq.in.): 3,000
Ii. marks
N.m~t $1u~p dn.~ : D~.v~ ) Tempi iLl~;.I (L~.-'Sq.I~I
WTC 106 6" B 07/05/94 95,880 3,390
WTC 107 6" 8 07/05/94 102,600 3,630
WTC 108 6" 28 07/25/94 127,200 4,500
WTC 109 6" 28 07/25/94 123,880 4,380
WTC 110 6" Hold Hold
Test ,¥1cth~h Utilized F~act~u~
A,¥1'M C-31.C-39.C-143 ;Unless Sold O,.~r~i.~ Cylinders Made By: J
Remarks and/or Distribution:
cc: Gary Sieb - City of Coppell
Larry Davis - City of Coppell
Mike Sherpinskas - Diversified Construction Services, Inc.
Jim Bullock - F & S Partners c/~,~,~ //
Russell Williams - Brockette Davis Drake, In --
13~ C on,ul~:,, Znc. Reviewed by: