Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
CF-Cozby Library-LR 940705 (4)
G EOTECHNICAL E GEE Consultants, Inc. F 2540 Glenda lane · Suite 10g · Dallas, lexas 7522~ · (214) 620-~7~1 · Fax (214) 620-0704 REPORT OF CONCRETE MIX INSPECTION Report Date: July 5, 1994 Date Con~re~ Placed: June 27, 1994 S~andard 6"x12" Client: City of Coppell Area 28.27 Squar~ Inches Project: W.T. Cozby Public Library Concrete Repor~ No.22 Contractor: Diversified Construction Services, Inc. Coocret¢Supplicrand Plant: Texas Industries, Inc. - Plant #41 Location of Placement: Slab 1st Floor (east end) MATERIALS ~, ~D .~w~. INSPECTION DATA D~c~ilsio. 0~b~;CuY4! ,MiX Number: 45 Time Samp|e Batched: 10:4! am Cement: 4.55k Time San%pled: I 1:10 am Sample Location: 25' W o£ NE corner Fly Ash: Truckfricket No: 421;!35190 Coarse Aggregate: 1" C.S. Tcnkoerature: Intermediate Aggregate: Ambient Range: 95°F Fine Aggregate: Concrete Range: 90°F Admixtures: Slump Range (inches): Weather Conditions: Clear/Strong wind I Admix Time Started: 6:i5 am 2 Time Completed: 12:30 pm Added Water: I0 gal. Sample Air Content (%): No Test To'-I Cubic Yards Placed: 220.0 C.Y. Required Strength (Lbs..:sq.in.): 3,000 Specm~n Mea.~ured A~ Dmz: Tolal [.mud Compge~iv~ Strength ~r~ N~r SI~ ~} i~; T~ (L~.I i~.:~.~.l WTC 116 6~ 8 07/05/94 97,080 3,430 WTC 117 6~ 8 07/05/94 104,480 3,700 WTC 118 6~ 28 07/25/94 116,140 4,110 WTC 119 6~ 28 07/25/94 119,600 4,230 WTC 120 6~ Hold Hold T~, Me~ L'ti~ F~ ~s~r Cvlinde~ Mad~ By: J. R. A~M C-31 ,C-39,C- 143 ~U~ N~ O~'~ · ' R=marks and/or Dist6bution: cc: Gary Sieb - City of CoppeLL Larry Davis - City of Coppell ~ike Sherpinskas - Diversified Construction Services,~ Inc. Russell Willies - Brockette Davis Drake, Inc. ~ ~ns~mks, Inc. Revie~ by: