CF-Cozby Library-LR 940719 (3) G EOTECHNICAL
E GEE Consultants. inc.
2540 GIenda Lane * Suite 10g · Dallas, Texas 75229 · {214) 620-9791 · Fax (214) 620-0794
REPORT OF CONCRETE MIX INSPECTION
Report Date: July 19, 1994 Date Concrete Placed: June 21, 1994 Standard 6'x12'
Client: City of Coppell Area 28.27 Square Inches
Project: W.T. Cozby Public Library
Contractor: Diversified Construction Services, Inc.
Concrete Supplier and Plant: Texas Industries, Inc. - Plant #41
Location of Placement: Slab 1st Floor (west end)
s~,~.' s~ ~,~w~,. INSPECTION DATA
MATERIALS o,~.~i~, ,t~..'c~va~
Mix Number: 45 Time Sample Batched: 9:36 am
Cement: 4.Ssk/yd Time Sampled: 10:[0 am
Sample Location: 65'£ of W end, 25' Sot' N end
Fly Ash: Truck/Ticket No: 483~231966
Coarse Aggregate: 1' C.S. Temperature:
Intermediate Aggregate: Ambient Range: 87°F
Fine Aggregate: Concrete Range: 90°F
Slump Range (inches): 6~,~
Admixtures: Weather Conditions: Partly Cloudy
1 Admix Time Started: 5:15 am
2 Time Completed: I 1:00 am
Added Water: 25 gal. Sample Air Content (%):
Total Cubic Yards Placed: 210.0 C.Y.
Required Strength (Lbs.;sq.in.): 3.000
Sl~ec'imcn Measus~i A~c Dam Total Load Coml~ssive St~h Remari~
WTC 101 6~ 7 06/28/94 89,240 3,160
WTC 102 6½ 7 06/28/94 85,760 3,030
WTC 103 6½ 28 07/19/94 114,540 4,050
WTC 104 6½ 28 07/19/94 118,360 4,190
WTC 105 6½ Hold Hold
Test M¢,,.h~ Utiliz~l Fracture Regular Cvlinders Made By: J. R.
ANrM C-31,C-39,C-143 ~Unka~ No,ed Ol~:r'~.'ise) -
Remarks and/or Distribution:
cc: Gary Sieb - City of Coppell
Larry Davis - City of Coppell
Mike Sherpinskas - Diversified Construction Services, Inc.
Jim Bullock - F & S Partners
Russell Williams - Brockette Davis Drake, Inc...,~/ ,
/
AIl ~tem ami mpo~ am for tl~ eateJu~ive um of I1~ cliena to ~,-ham limy a~ ~ ~ s~ ~ ~ ~ ~ ~ ~1 ~ of G~ C~. ~. TI~ ue~ of our r~m~ must ~ceiw