CF-Cozby Library-LR 940705 (7) G EOTECHNICAL
E GEE Consultants, inc.
2540 Glenda Lane · Suite 10g · Dallas, Texas 75220 · {214) 620-97~1 · Fax (214) 620-9704
REPORT OF CONCRETE MIX INSPECTION
Report Da~: July 5, 1994 Date Concrete Placed: June 7, 1994 S~andard 6'x12'
Client: City of Coppell Area 28.27 Square Inches
P~ject: W.T. Cozby Public Library
Contractor: Diversified Construction Services, Inc.
Concrete Supplier and Plant: Texas Industries, Inc. - Plant #41
Location of Placement: CO lumn s
MATERIALS .~,~, SSD,.~ w,. INSPECTION DATA
I~'ril~ieu ~Lh~;CuYd)
Mix Number: 8203 Time Sample Batched: 3:44 pm
Cement: Time Sampled: 4:0.5 pm
Sample Location: Column A-4
Fl)' Ash: Track/Ticket No: 86/226388
Coarse Aggregate: I" CS Temperature:
Intermediate Aggregate: Arabient Range: 102°F
Fine Aggregate: Concrete Range: 93°F
Admixtures: Slump Range (inches): 6~A
Weather Conditions: Partly Cloudy
I AEA Time S~arted: 2:30 pm
2 Time Completed: 5:40 pm
Added Water: 5 gal. Sample Air Content (%) No Test
Total Cubic Yards Placed: 10.0 C.Y.
Required Strength (Lbs.!sq.in.): 3.000
WTC 81 6½ 7 06/14/94 78,790 2,790
WTC 82 6½ 7 06/14/94 70,400 2,490
WTC 83 6½ 28 07/05/94 108,640 3,840
WTC 84 6½ 28 07/05/94 102,020 3,610
WTC 85 6½ Hold Hold
Ttat .M~a~da ttiliz~ Feature R~guiar C¥'linders Made By: K. Mc.
Remarks and/or Distribution:
cc: Gary Sieb - City of Coppell
Larry Davis - City of Coppell
Mike Sherpinskas - Diversified Construction Services, Inc.
Jim Bullock - F & S Partners /-%
Russell Williams - Brockette Davis Drake, Inc..-'~/ o
All I~tmvs and ~ons ate foe ~ r..z¢iu~iv~ un~ of tho cli~t to wht~n ~ as~ add~ne, ssed and shall no~ be r~x:[~ ,a.4thout Ii~ full approval of GEE Cot~u.ltams, lac'. ~ us~ of our .nan~ must
om' in~r w~fitt~n approval. O~g Ir.t~=ra ~nd rq~ot~ apply oniy lo ,h~ sampio te~ed and/or inspe~-~d nmi am no~ n0o~s~ily ~ti~ of ~ ~t~ of ~y ~ ~ s~r ~.