Loading...
CF-TownC CHC-CN 860522HOWARD U. FREEMAN, INC., 1424 E. Grauwyler I P.O. Box 151657 1 Irving, Texas 75015 1 (214) 438-6044 Commercial Builders May 22, 1986 City of Coppell 616 S. Coppell Street Coppell, Texas 75019 Attention: Mr. Frank Procter Re: Coppell Town Center Dear Mr. Procter: Enclosed please find the following Change Orders: Change Order No. 7, four (4) copies fully executed. Change Order No. 8, six (6) copies signed by Howard U. Freeman. Change Order No. 9, six (6) copies signed by Howard U. Freeman. Change Order No. 10, six (6) copies signed by Howard U. Freeman. Please note that we have revised Change Order No. 9 to indicate a 42-day time extension. At the time this proposal was submitted, only 28 days was requested as it would run concurrent with other changes. The Owner's delay in approving this change, however, will require a 42-day extension based on receipt of a fully executed change order in our office no later than May 26, 1986. Please return one (1) fully executed copy of Change Orders No. 8, 9 and 10 for our files. Yours very truly, JW/mhc Enclosure s CHANGE ORDER AIA DOCUMENT G701 Distribution to: OWNER ARCHITECT CONTRACTOR FIELD OTHER City of Coppell - Frank Procter O'Brien O'Brien Callaway Howard U. Freeman - J. Bosquez PROJECT: Coppell Town Center (name, address) Parkway Blvd. Coppell, Texas TO (Contractor): Howard U. Freeman, Inc. 1424 E. Grauwyler Irving, Texas 75015 CHANGE ORDER NUMBER: INITIATION DATE: May 5, ARCHITECT'S PROJECT NO: CONTRACT FOR: General CONTRACT DATE: You are directed to make the following changes in this Contract: Seven (7) 1986 8457 Construction March 28, 1985 Refer to Proposal Request No. Two (2), Item 3 bronze Josam #25010 or Wade W-3944 rain drips This change results in an add to the original $2,219.00. - Provide and install eight (8) for all downspout penetrations. Contract amount by the sum of HOWARD UL fR£b~-;:.: Not valid until signed by both the Owner and Architect. Signature of the Contractor indicates his agreement herewith, including any adjustment in the Contract Sum or Contract Time. The original (Contract Sum) I..G:~~~~) was ........................... $ 2,528,586.00 Net change by previously authorized Change Orders ................................... $ 1,641.00 The (Contract Sum) ~Cy~~fxt~x~xt) prior to this Change Order was .......... $ 2,530,227.00 The (Contract Sum) i~x~k~,~cR~.x~ will be (increased) by this Change Order ......................................................... $ 2,219.00 The new (Contract Sum) ((Rxawg~t~Xa~xX~1~O~M including this Change Order will be ... $ 2,532,446.00 The Contract Time will be ~m;~×~ (unchanged) by ( -0- The Date of Substantial Completion as of the date of this Change Order therefore is O'Brien O'Brien Callaway RCHITECT 131 McKinn~y Ave., #850 · ddress ," ~/'~ Dalal s b .T~x/~75~04 Howard U. Freeman, Inc. C~N21~ A~ Ruwy 1 e r Address AIA DOCUMENT G7D1 · CHANGE ORDER © 1978 THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVE., N.W., WASHINGTON, D.C. 20006 ) Days. Authorized: City of Coppell 06vy~E~. Coppell Street Address Coppe/l~_~, Texas 75019// -- t978 CHANi3E · ORDER AIA D~OCUMENT G701 Di s~=~bulion lo: eVeNER ARCHITECT CO"~TRACTOR ' FIELD OTHER . ~ £f~:~6f Coppell - Frank 'Proct~r [] 'O'~rien O'grien Callaway [] MoP, rd U. F~eeman - J. Bosquez PROJE. CT: Coppell Town Center (name. address, Parkway nBlvd. Coppell, Texas TO '~C,onlractor~' I CHANGE ORDER NUMBER' Eight (8) t\ITIATION DATE: May 16, 1986 &RCHIIECI'S PROJECT NO: 8457 CONIRACI FOR. General Constructien Howard U. Freeman, Inc. 1424 E. Grauwyler J Irivng, Texas 75015 J C~DNIRACT DATE: You are directed to make the following chan~es in this Contrac~ Marcy 28, 1985 Provide and install Omega Prohibiter Automatic institutional Sprinkler Heads in jmil cells 163 and 161. This change results f_n an add to the original Contract Sum of $495.00. Not ~.s~iid until si?ed by both the ex, net and Arch,:es=. Signa:=tre of the Contractor indicates h:s agreemen: ~-e:e~,,ith, including an, s,:i~ustment in the Contract Sum or Contract Time. The ec'iginal (Contract Sum) (tg~l~l~[l~~'~t) was ........................... $2,528,586. O0 Net C'~ange b'~ previously authorized Change O~ers .................................. $ 3,860. O0 The ,C.ontract Sum) (:Ou~~'M~].~~. prior to this Chan~e Order was .......... $2,532,446. O0 The ~C:ontract Sum) ~~~~ will be (increased b,,v this Change Order .......................................................... $ 495.00 The new (Contract Sum) ~~~~ including this C:~ge Order will be ... $2 ~ 532,94 ~. 00 The Cc:retract Time will be ~~~[~ (unchanged) by ( -0- : Days. The ~:~te of Substantial Completion as of the da:e of this Change O-~r therefore is Authorized: O'Brien O'Brien~allaway H.~ward U. Freemm~, Inc. City of Coppell --- 54_~ ~. ~rau~ter ~ ~. Coppell Street Dal2~s/~x~0~ !~g, Texas 7591~ ~ Coppel~ Texas 750i~ CHANGE.! ORDER. AIA DOCUMENT G70:l E~istribt]ti0n to: OWNER ARCHITECT CONTRACTOR FIELD OTHER ~' ~C~.~£ Coppeil - Frank Procter ~ [] O,Brien O'Bri~n:Callaway . []. Howard U~ Freeman - J. Bosquez PROJEC':F: (name, address) TO (Contractor): I Coppell Town Center Parkway Blvd. Coppell, Texas Howard U. Freeman, Inc. 1424 E. Grauwyler Irving, Texas 75015 CHANGE ORDER NUMBER: Nine INITIATION DATE: May 16, 1986 ARCHITECT'S PROJECT NO: 8457 CONTRACT FOR- (9) General Construction CONTRACT DATE- .March 28, 1985 You are directed to make the following changes in this Contract: Add the following walls, doors, sidelights, and hardware to enclose rooms as shown on Sketch SK-1 dated 2-25-86 to create Personnel Dept. and Engineer Office.' Also add one (1) parabolic fluorescent fixture in Personnel Office and a switch to control that room separately. Refer to P.R. #14 dated 3-27-86. This change results in an add to the Original Contract Amount of $2,690.00. Not valid until signed by both the Owner and Architect. Signature of the Contractor indicates his agreement herewith, including any adjustment in the Contract Sum or Contract Time. The original (Contract Sum) '-'~a,l~:~lJ4~x~Rk-~R~) was ........................... $ 2,528,586.00 Net change by previously authorized Change Orders ................................... $ 4,355.00 The (Contract Sum) {~k~J~.-~~l~Z~X~) prior to this Change Order was .......... $ 2,532,94 !. 00 The (Contract Sum) ~x~x~~~:C..x~ will be (increased) ~~~) by this Change Order ......................................................... $ 2,690.00 The new (Contract Sum) (~g~l:2~X~,1~X~cs:~ including this Change Order will be ... $ 2,535,631.00 The Contract Time will be ~¢~t×~de~td~ (unchanged) by ,,le~.,~,~,~ ~? ( _.,~-'_ ) The Date of Substantial Completion as of the date of this Change Order therefore is O'BrieyO'Bri~n Callaway. Howard U. Freeman, Inc. ARCH I T EC71- ~ ' 3 131 ~cKinne~ Av~e., ~850 C~T~A~wyler Address / ~ I Address D a 1 a~.a~s 752J4 DATE AIA DOCUMENT G701 · CHANGE ORDER THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVE., N.W., WASH NGTON, D.C. 20006 Authorized: City of Coppell (~E~. Coppel! Street ~ddress I~i~v Texas 75015 Coppell, Texas 75019z~ rAPRIL 1978 EDITION · AIA® · ~ 1978 ORDER. AIA DOCUMENT G701 Distribution lo: OWNER ~' "C:i-t~z &f Cou:'--~:~--]-! - Frank Proct'er ARCHITECT [] O'Brien O'~.en Callaway CONTRACTOR [] Howard U. Tre~eman - J Bosquez FI'ELD [] OTHER [] 'PROJECT: (name, address) TO (Contractor): I Coppell ]:~wn center Parkway Blvd. Coppell, Texas Howard U. Freeman, Inc. 1424 E. Grauwyler Irving, Ze~xas 75015 CHANGE OR~£R,' NUMBER: Ten (10) INITIATION G~TFE: May 16, 1986 ARCHITECI'5 ~'~IOJECT NO: 8457 CONTRACT F-CC.: General Construction ICONTRACT C~--E: March 28, 1985 You are directed to make the ~c,llowing changes in this Contract: At the direction of Mr. Ed Powell, City Engineer, City of ::~pell, relocate existing gyp board wall (north wall) at Comphter Room 115 £~ revised originally by P.R. #13. Relocat":n of MEP as necessary. This change results in ~n add to the Original Contract Amc~--~ of $463.00 Not valid until signed by both the O',,,'-~r and Architect. Signature of the Contractor indio=;es -,~ agreement herewith, including any adjustment ~r: t~e :.:retract Sum or Contract Time. The original (Contract Sum) ~-~xS~t~.~.Rk~ft~) was ......................... $2,528,586.00 Net change by previously authorzed Change Orders ................................ $ 7,045.00 The (Contract Sum; ~2,~,~i~¢~xf:~xt) prior to this Change Order was ....... $2,535,631.00 The (Contract Sum; f~C_,nm~:~~~~ will be (increased) ~~) by this Change Order ....................................................... $ 463. O0 The new (Contract Sum~ (~~~~M including this Change Order ~¢;~ ~ ... $2,536,094.00 The Contract Time will be ~~X~~ (unchanged) by ( -0- ) Days. The Date of Substantial Comple:.o~ as of the date of this Change Order therefore is Authorized: O'Brien O'Brien Cal!awav Howard U. Freeman, Inc. City of Coppell RCHITE~ CO~A~T~ R .... ~E -- 131 McK~y $~., t:~8~0 ~Z4' G~u~ler ~IB ~. Coppell Street Address /)~p I ~ ~-~ ~ Dalals~~o~204/~ I~, Texas 7s01~ ~ Coppell, Texas 7s0~ AIA DOCUMENT G701 · CHANC~ DRDER · APRIL 1978 EDITION · AIA~ · ~ 1c-: ~~ I . THE AMERICAN INSTITUTE OF .ARCH:TE~S, 1735 NEW YORK AVE., N.W., WASHINGTON, D.C 2~,2~ ~ ~}m - ~sTs