Loading...
CF-TownC CHC-CN 860516 HANGE ORDER AIA DOCUMENT G701 Distribution to: OWNER [] ARCHITECT [] CONTRACTOR [] FIELD [] OTHER [] City of Coppell - Frank Procter O'Brien O'Brien Callaway Howard U. Freeman - J. Bosquez PROJECT: Coppell Town Center (name, address) Parkway nBlvd. Coppell, Texas TO (Contractor): I Howard U. Freeman, Inc. 1424 E. Grauwyler Irivng, Texas 75015 CHANGE ORDER NUMBER: Eight (8) INITIATION DATE: May 16, 1986 ARCHITECT'S PROJECT NO: 8457 CONTRACT FOR: General Construction CONTRACT DATE: Marcy 28, 1985 You are directed to make the following changes in this Contract: Provide and install Omega Prohibiter Automatic Institutional Sprinkler Heads in jail cells 163 and 161. This change results in an add to the original Contract Sum of $495.00. Not valid until signed by both the Owner and Architect. Signature of the Contractor indicates his agreement herewith, including any adjustment in the Contract Sum or Contract Time. The original (Contract Sum) (~xte~x~x~xt:~o~ was ........................... $2,528,586.00 Net change by previously authorized Change Orders ................................... $ 3,860.00 The (Contract Sum) (f_xmxmJme~lx~mm~:~) prior to this Change Order was .......... $2,532,446.00 The (Contract Sum) ~_,~~~~IR will be (increased) by this Change Order ......................................................... $ 495.00 The new (Contract Sum) f~ct~e~lx/~mm~x~t) including this Change Order will be ... $2,532,941.00 The Contract Time will be ~nk)x~H~m~l) (unchanged) by ( -0- ) Days. The Date of Substantial Completion as of the date of this Change Order therefore Js Authorized: O'Brien O'Brien~allaway Howard U. Freeman, Inc. City of Coppell ~IT~cIK~~., ~50 ~.T~r~--- ~--~7C~Street Address / ~ I/ / ~ --- Address Dalla~e~a~J~O~_____ Irvi__ng, Texas 75015 /q Coppell, Texas 75019/9 THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVE., N.W., WASHINGTON, D.C. 20006 (~,~'~ ~1 ~', '[ (i]701 -- 1978 CHANG'E ORDER i~IA DOCUMEN.T G70'! Distribution to: OWNER ARCHITECT ' CONTRACTOR FIELD OTttER []%~J~yic~f Coppell - Frank Procte~ ' [] O'B~ien O'Brien Callaway · 'i' ':~- []3 Howard ~J.~Freeman - J. Bosquez~ ~ PROJECT: Coppell Town Center Iname, address) Parkway nBlvd. · ~ Coppell, Texas TO (Contractor): I CHANGE ORDER NUMBER: Eight (8) INITIATION DATE: /,[ay 16, 1986 ARCHITECT'S PROJECT NO: 8457 CONTRACT FOR' General Construction Howard U. Freeman, Inc. 1424 E. Grauwyler I Irivng, Texas 75015 . [ CONTRACT DATE: You are directed to make the following changes in this Contract: Marcy 28, 1985 Provide and install Omega Prohibiter Automatic Institutional Sprinkler Heads in jail cells 163 and 161. This change results in an add to the original Contract Sum of $495.00. Not xalid until signed by both the O~ner and Architect. Signature of the Cor:.tractor indicates his agreement herewith, includimg any adjustment in the Contract Sum or Contract Time. The original (Contract Sum) (~uim'~l~lg'~[~x~tx-Cxcm~ was ........................... $2,528,586.00 Net change by previously authorized Change Orders ................................... $ 3,860.00 The I'Contract Suml (~xm~,~~i~t) prior to this Change Order was .......... $2,532,446.00 The (Contract Sum; (~__g.mz~k~xizr~u~:~7.,x~lR will be (increased; by this Change Order ......................................................... $ 495.00 The new (Contract Sum) (~Cacm~ac~t~mm~x[~.~) including this Change Order will be ... $2,532,941.00 The Contract Time will be (J~nxa~ ,x~,~mm~e~l) (unchanged) by The Date of Substantial Completion as of the date of this Change Order therefore is Howard U. Ereeman, Inc. Authorized: ( --0-- ) Days. S~R~. °~rauwy ler Address Irving, Texas 75015 AIA DOCUMENT G7111 · CHANGE ORDER · APRIL 1978 EDITION AIA~ · D 1978 THE AM~ERICAN INSTiiIUTE OF ARCHITECTS, 1735 NEW YORK AVE.. N3,~,' . WASHINGTON, D.C. 20006 City of Coppell ~E~. Coppell Street Address Coppe!l, Texas 75019 CHANGE '. ORDER " AIA DOCUMENT G70'I Distribu~ c-~ to: OWNER ARCHITECT.' CONTRACTOR FIELD OTHER [] ~itYi'°Y Coppell - Frank Procterc [] ' O';B~ien O'Brien C'allaway [] HbWard U. Freeman.- J. Bosquez PROJECT: marne, address~ TO (Contractor). I Coppell Town Center Parkway Blvd. Coppell, Texas CHANGE ORDER NUMBER: Nine INITIATION DATE: May 16, 1986 ARCHITECT'S PROJECT NO: 8457 CONTRACT FOR: (9) I Howard U. Freeman, Inc. General Construction 1424 E. Grauwyler Irving, Texas 75015. '[ CONTRACT DATE: .March 28, 1985 '~ ou are directed to make the following changes in :~is Contract: Add the following walls, doors, sidelizhts, and hardware to enclose rooms as Shown on Sketch SK-1 dated 2-25-86 tc :reate Personnel Dept. and Engineer Office. Also add one (1) parabolic fluorescent fixture in Personnel Office and a switch to control that room separately. Refer to P.R. #14 dated 3-27-86. ~his change results in an add to the Original Contract Amount of $2,690.00. valid until signed by both the Owner and Architect. S~--'nature of the Cc~tractor indicates his agreement herewd;- -,:luding any adjustment n the Contract Sum or Contract Time. O'Brien O'Brien Callaway Howard _-. Freeman, Inc. ARCHITECT ~-~ CC) ?)T~ A~,~--r 3i31 Mc~nn~v~., #850 ~-~ br?~zer Actress / ~/' DAT AIA DOCUMENT G701 * CHANGE ORDER · THE AMERICAN INST2TUTE OF ARCHITECTS, 1735 NEW YORK The original (Contract Sum) (.C~:~tJ~j~x'~k'~ was ........................... $ 2,528,586.00 Nez change by previously authorized Change Orders .................................. $ 4,355.00 T~e (Contract Sum, ~~~ prior:~:~isChange Order was .......... $ 2,532,941.00 The (Contract Sum~ :g3c~xa~t~:k:~t~~ will ~.~ 'increased) by this Change Order ......................................................... $ 2,690.00 T~e new (Contract Sum) (~t~.~l~X,~i~,m~,l: inc.~ding this Change Order will be ... $ 2,535,631.00 The Contract Time will be ~r~;~t~ ~.~:- .... m ~.. ' .......... ~ .... ~ ,~-~o ~,? ( -_~ )Days. / The Date of Substantial Completion as of the date of t~s Change Order therefore is Address I~nz, Texas 75015 APRIL 197& :_~-:'TION · AIA® · ~ 1978 · ,.W., WASH NGTON, D.C. 20006 Authorized: City of Coppell C~gE~. Coppell Street Address Coppell, Texas 75019 G701 ~ 1978 CF[ANGE ORDER AIA DOCUMENT G701 . -- .. -., .~ ~. Distribution to: - ' ~ :~f Coppell Frank Proct'~? ~ OWNER . ' [] ~'i - ARCHITECT' [] O!,Brien O'grien Callaway CONTRACTOR [] Howard U. Freeman - J. 'Bosquez FIELD [] OTHER' [] PROJECT: Coppell (name, addressj Parkway Co?pell, TO (Contractor). I' - Town Center Blvd. Texas.' Ho~-ard U. Freeman, Inc. 1424 E. Grauwyler Irving, Texas 75015 CHANGE ORDER NUMBER: Nine (9) INITIATION DATE: May 16, 1986 ARCHITECT'S PROJECT NO: 8457 CONTRACT FOR: General Construction CONTRACT DATE: You are directed to make the following changes in this Contract: .March 28, 1985 Add the followinz walls, doors, sidelights, and hardware to enclose rooms as shown on Sketch YK-1 dated 2-25-86 to create Personnel Dept. and Engineer Office. Also add one (1) parabolic fluorescent fixture in Personnel Office and a switch to control that room separately.:' Refer to P.R. ?:;~ dated 3-27-86. This change resu'ts in an add to the Original Contract Amount of $2,690.00. Not valid until signed by I:,c7~ the Owner and Architect. Signature of the Contractor -~dicates his agreement herewith, including any adjustment in the Contract Sum or Contract Time. The original (Contract Sum) CCcX~r'~c~x~.~Rk-~t¢~) was ........................... $ 2,528,586.00 Net change by previous',~ authorized Change Orders ................................... $ 4,355.00 The (Contract Sum) ~-x~;~itl~k&~jm~:jx~x:~:~:t) prior to this Change Order was .......... $ 2,532,94 1.00 The (Contract Sum) ~~~~ will be (increa~d) by this Change Orde: . ........................................................ $ 2,690.00 The new (Contract Sum ~~~~~ including this Change Order will be ... $ 2,535,631.00 The Contract Time will ~ ~~~ ~ ~c~ ~ ( -~- I Dav~/ The Date of Substantial Cmmpletion as of the date of this Change Order therefore is ~. Authorized: O'Brien O'Brien Callaway Howard U. Freeman, Inc. City of Coppe!l RCHITECTi3i McKi~e~., #850 C~T~A~ler ~gE~. Coppe!! Street Address ~~ a Address Dalai s ~x~2"~ ~ Address Irv~, Texas 75015 Coppell, Texas 75019 AIA DOCUMENT G701 ~ CHA~GE ORDER · APRIL 1978 EDITION · AIA® · ~ 1978 ~ THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVE., N.W., WASHINGTON, D.C. 20006 ~ ~/~ G7~ -- 1978 CHANGE- ' ORDER AIA DOCUMENT G701 Distribution to: OWNER ARCHITECT CONTRACTOR FIELD - OTHER ~ :~CiLV*-of Coppell - Frank Procter []' O'B~ien O'Brien Callaway [] Howard U. Freeman- J. Bosquez PROJECT: Iname. address) TO (Contractor): I Coppeil Town C&nter Parkway Blvd. Coppell, Texas Howard U. Freeman, Inc. 1424 E. Grauwyler Irving, Texas 75015 CH~,NGE ORDER NUMBER: Ten (10) INITIATION DATE: May 16, 1986 ARCHITECT'S PROJECT NO: 8457 CONTRACT FOR: General Construction CONTRACT DATE: .March 28, 1985 You are directed to make the following changes in this Contract: At the direction of Mr. Ed Powell, City Engineer, City of Coppell, relocate existing gyp board wall (north wall) at Computer Room 115 as revised originally by P.R. #13. Relocation of MEP as necessary. This change results in an add to the Original Contract Amount of S~63.00 HOWARD U. FRE,:,,,.."., NCORPORAT;:£~, Not vai~d ~.qtil signed by both the O~ner and &rchitect. $:gnature of the Contractor indicates his agreement herewith, including any adjustment in the Contract Sum .'ar Contract Time. The original (Contract Sum) (f-c~~~~) was ........................... $2,528,586.00 Net change by previously authorized Change Orders ................................... $ 7,045.00 The (Contract Sum) ~;~:~...~) prior to this Change Order was .......... $2,535,631.00 The (Contract Sum) ~T_,x't~:~n~]m~d(A~x~~ will be (increased) k~k"~"'~xl,ki-t~d:tam~x]) by this Change Order ......................................................... $ 463.00 The new Contract Sum) (~~~~ including this Change Order will be ... $ 2,536,094.00 The Contract Time will be Mm~X~ (unchanged) by ( -0- ) Days. The Date of Substantial Completion as of the date of this Change Order therefore is Authorized: O'Br!en O'~rien Callaway Howard U. Freeman, Inc. City cf Coppell ARCHITECT, / ) ' 3131 Mc~n~v~., #~50 C~A~B~ler ~gE~. Coppell Street Dala!s~,/¢~~4/ I~g, Texas 75015 A~:r;S/ei:, Texas 75~ THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVE., N.W., WASHINGTON, D.C. 20006 G701 ~ 1978 ORDER AI,~ DOCUMENT G701 Distribbtion to: '~l'~City~of Coppell - Frank 'Procter ARCHITECT ~[] O'Brien O'Brien Callaway. CONIRACTOR ~ 'Howard U. Freeman'- J. Bosquez FIELD [] OTHER [] PROJECT: (name, address) TO (Contractor) I Coppell Town Center Parkway Blvd. Coppell, Texas Howard U. Freeman, Inc. 1424 E. Grauwyler Irving, Texas 75015 CHANGE ORDER NUMBER: Ten (10) INITIATION DATE: May 16, 1986 ARCHITECT'S PROJECT NO: 8457 CONTRACT FOR: General Constructie-_ CONTRACT DATE: .March 28, 1985 You are directed to make the following changes in this Co~'¢ract: At the direction of blr. Ed Powell, City Enzlmeer, City of Coppell, relocate existing gyp board wall (north wall) at Cc~---.,u¢er Room 115 as revised originally by P.R. #13. Relocation of MEP as necessary. This change results in an add to the Original Contract Amount of $463.00 Not valid ;-til signed by both the O~er and Architect. Signature c- the Contractor indicates his agreement herewith, includ -g imy adjustment in the Contract Sum or Contract Time. The original (Contract Sum~ (f,x~kex~x~Rk-~,-~ was .......................... $2,528,586.00 Net chan~e by previously authorized Change Orders .................................. $ 7,04_5.00 The (Contract Sum) ~"5~.~m~:.~x~:~,xt) prior to this C-amge Order was .......... $2,535,631.00 The (Contract Sum) ~Y,c~:~'~k~~~ will be (incre~-~ad) k;k'x~,~ff~'.,d~l:~M~l) by thi_~ Change Order ......................................................... $ 463.00 The new ,Contract Sum) (~g~l:X~,~:~C~ includin~ 7,s Change Order will be ... $ 2,536,09~ .00 The Contract Time will be ~m'~me~[×~ (unchanged b~ ( The Date of Substantial Completion as of the date of this Chan.~~_ Order therefore is Authorized: O'grien 0'grien Callaway Howard U. Fre~eman, Inc. City of Coppell A3RCH 1TECT ~ -~ ~ 131 Mc~inne~e., -'7 DATE /~ -0- Days. 50 C1C~"~iTZ~A~I~'(~wvZer (~'%gEPS. Compe!l S tree: ~ Addres~ - I~g, Te:ca~.75015~ Coppell, Texas 75019 ORDER · APRIL 1978 EDITIO',, - AIA~ ' ~ 1978 [TE~S, 1735 NEW YORK AVE_ N.W ~,SHINGTON. D.C. 20006