CF-TownC CHC-CN 860130CHANGE ORDER AIA DOCUMENT G701 Distribution to: OWNER ARCHITECT CONTRACTOR FIELD OTHER [] City of Cqppell - Frank Proctor [] O'Brien O'Brien Callaway [] Howard U. Freeman - J. Bosquez PROJECT: Coppell Town Center (name, address) Parkway Blvd. Coppell, Texas TO(Contractor): I ~oward U. Freeman, 1424 E. Grauwyler Irving, Texas 75015 lnc. CHANGE ORDER NUMBER: Six (6) INITIATION DATE: January 30, 1986 ARCHITECT'S PROJECT NO: 8457 CONTRACT FOR: General Construction I CONTRACT DATE: 28 March 1985 You are directed to make the following changes in this Contract: 1. Extend existing P.V.C. sleeving, approximately 40 LF, at median area on Parkway Blvd. where median opening has been increased. This change results in an add of $ 350.00 Extend contract completion date due to adverse weather conditions which interfered with construction progress on the following dates: April 13, 15, 16, 22, 23, 24, 29, 30; May 1, 2, 3, September 14i October 11, 12, 14, 29, 30; November 22, 23, 26, 27, 29, 30; December 2, 3, 4, 10, 11, 12, 13. Total days noted thirty (30) less ten (10) already anticipated results in an extension of twenty (20) calendar days. Not valid until signed by both the Owner and Architect. Signature of the Conlractor indicates his agreement herewith, including any adjustment in the Contract Sum or Contract Time. The original (Contract Sum) (~gi~t~ig~?igih~zc~-,lq was ........................... $2,528,586.00 Net change by previously authorized Change Orders ................................... $ .l, 29 1.00 The (Contract Sum) (~x~lx~x~m~m'-~g~.~) prior to this Change Order was .......... $2,529,877.00 The (Contract Sum) (Xg~x_i~ge~xJx~~~ will be (increased) ~r~z.,.~) gm~l~r'~'~) by this Change Order ......................................................... $ 350.00 The new (Contract Sum) (f.~g~~R~Rwx~A~9~R) including this Change Order will be ... $2,530,227.00 The Contract Time will be (increased) (~l~(~a~) (tmd~) by twenty ( 20 The Date of Substantial Completion as of the date of this Change Order therefore is February 23, 1986. Authorized: ) Days. O'Brien O'Brien Callaway ARCHITECT 3131 McKSn~ney Ave., #850 Da].las~~/75~04 Howard U. Freeman, Inc. CO~IRACIOR 1424 E. Grauwvler Add ress Ir,~i~ Texas 7.5015 City of Coppell OWNER 616 S. Coppell St. Address Coppell, Texas 75019 AIA DOCUMENT G701 CHANGE ORDER · APRIL 197g EDITION ' AIA® · ~' 1978 THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVE., N.W.. WASHING-[()N, D.C. 20006 G701 -- 1978