CF-TownC CHC-CN 860404
CONSTRUCTION CHANGE AUTHORIZATION AIA DOCU^IENT G713 (Inslructions on reverse side) Owner Architect Consultant Contractor Field Other Wayne Ginn~- Ginn, Inc. O'Brien O'Brien Callaway Howard U. Freeman PROJECT: (name, address) OWN L:R: TO: (Contractor) CONTRACT FOR: Coppell Town Center Parkway Boulevard Coppell, Texas City of Coppell 6161 Coppell Road Coppell, Texas 75019 Howard U. Freeman 1424 E. Grauwyler Irving, Texas General Construction C()NSTRUCTION CHANGE AUTH()I,tlZATION NO: Four (4) DATE OF ISSUANCE: April 4, 1986 ARCHITECT: O'Brien O'Brien Callaway 3131 McKinney Avenue Suite 850, LB 113 Dallas, Texas 75204 ARCHITECT'S PROJECT NO: 8457 In order to expedite the Work and avoid or minimize delays in the Work which may affect Contract Sum or Contract Time, the Contract Documents are hereby amendecl as described below. Proceed with this Work promptly. Submit final costs forWork involved and change in Contract Time (if any), for inclusion in a subsequent Change Order. Description: See attached Sheet 1. Sheet 2. Sheet 3. Sheet 4. SK-1. :- SK-2. sheet for further descriptions. Floor plan shows changes to room #165. Add pay window as shown. Add pay counter as shown. Adjust and add lights as shown. Countertop sketch. Counter and glass sketch. Attachments: (//ere insert listing oi dncumenls ll~al suppor! de:crip!~on.) Th'e following is based on information provided by the Contractor: Method of Determining Change in the Contract Sum' [] Fixed [] Estimated Change in Contract Sum nfS 86,500.00 [Xl Maximum (lump sum, unit prices, cost plus fee or other) [] Fixed Change in Contract Time [] Estimated of 42 days [] Maximum days c,,---- / n~ O' Brien CallataY Al^ DOCUMENT G713 · CONSTRUCTION CHANGE AUIHORIZATI()N · M,,\RCII 1979 EDITION · AIA~a ®1979 · ~HE :\MERICAN INSFITUfE OF ARCH IEECTS, 1735 NE'~V YORK AVE., N.VV., WASHINGTON, D.C. 20006 , Dat , fn tractor . G713 -- 1979 SHEET I ~ Change the court room Multi use room to J~ smaller offices 165, 165A, Add the electrical outlets, telephone outlets and light switches shown to control the new lighting plan. Add the counter top on the inside and receiving top on the outer wall of room 165A. The counter tops will be a plastic laminant with a rolled oak trim at the edge. Refer to sketches 1 and 2 attached for similar conditions of the counter top construction. SHEET 2 This elevation reflects the changes to the new court room showing the raised panel wood door that will be painted and trim to match Door No. 50. The teller window is also shown that will match the other window in the northwest corner of the lobby. The counter top construction will be plastic laminant Wilson Art No. D-91-6 Slate Grey. SHEET 3 Add the counter top to the interior side of Office 165A as shown, paint all wood trims similar to the construction of the other windows and counter tops locatged in the northeast corner of the lobby. Stain the wood edges similar also. SHEET 4 1. Adjust and add the light fixtures shown on this sheet. SK-1 This sketch is shown for clarification of construction and is taken from previously submitted shop drawings to help explain the counter top construction. SK-2 This sketch is shown for clarifications to aid in the construction of the new pane window. The window construction is to be similar to the windows going in the northwest corner of this lobby. A gyp board furr down with corner beads will abutt the top of the wood window. This change is not to exceed $6,500 and not to exceed 42 days~ r~ Il ' 0 ©