Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
CF-TownC CHC-CN 860613
ARCHITECTURE PLANNING - INTERIORS McKinney Place · 3131 McKinney Avenue · Suite 850 - LB 113 · Dallas, Texas 75204 ° (214) 871-9100 Transmittal Letter To: , I am sending you the following: -~Attached ~ Under Separate Cover [] Prints [] Specifications [] Sepias [] Shop Drawings Copies Date No. , Items transmitted as checked below: [] For Approval [] For Your Use ~s Requested [] For Review and Comment Remarks: By: [] Samples ~ Field Order [] Copy of Letterj~ [] Change Order [] Approved as Submitted [] Approved as Noted [] Returned for Corrections Cop~es to CONSTRUCTION CHANGE AUTHORIZATION AIA DOCUMENT G713 (Instructions on reverse side) Owner [] Architect [] Consultant [] Contractor [] Field [] Other [] City of Coppell O' Brien 0 'Brien Callaway Howard U. Freeman PROJECT: (name, address) OWNER: Coppell Town Center W. Park Blvd. Coppell, Texas City of Coppell TO: Howard U. Freeman, Inc. (Contractor) 1424 E. Grauwyler PO Box 1657 Irving, Texas 75060 CONTRACT FOR: General Construction CONSTRUCTION CHANGE AUTHORIZATION NO: Five (5) DATE OF ISSUANCE: June 13, 1986 ARCHITECT: O'Brien O'Brien Callaway 3131McKinney Ave., Suite 850, LB 113 Dallas, Texas 75204 ARCHITECT'S PROJECT NO: 8457 In order to expedite the Work and avoid or minimize delays in the Work which may affect Contract Sum or Contract Time, the Contract Documents are hereby amended as described below. Proceed with this Work promptly. Submit final costs forWork involved and change in Contract Time (if any), for inclusion in a subsequent Change Order. Description: Provide and install vinyl tile and vinyl base in the following areas: 1. Corridor area 6. Property storage 150 2. Vestibule 156 7. Intoxilizer 153 3. Booking 157 4. Kitchen 158 5. Vestibule 162 Armstrong Excelon Tile #51836, White Shelter 1/8" Gauge Attachments: (Here insert listing ut documents that support description.) The following is based on information provided by the Contractor: Method of Determining Change in the Contract Sum: Lump sum - not to exceed (lump sum, unit prices, cost plus fee or other) [] Fixed I [] Fixed _ . . / Change in Contract Sum -- ~]xl:stlmated~ of $ 650.00 (not to e_xceed) ~ I Estimated []MaximUm/J.' ~j/ i--IMaximum /Architect /// Owner Date Contractor ~ O'Brien OQQJ~en Callaway City of Coppell Howard U. Freeman Chan~e in Contract Time of --U-- days Date AIA DOCUMENT G713 ° CONSTRUCTION CHANGE AUTHORIZATION ° MARCH 1979 EDITION ' AIA® ©1979 ° THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVE., N.W., WASHINGTON, D.C. 20006 G713-- 1979 CONSTRUCTION CHANGE AUTHORIZATION AIA DOCUMENT G773 (Instructions on reverse side) Owner [] Architect [] Consultant [] Contractor [] Field [] Other [] City of Coppell O'Brien O'Brien Callaway Howard U. Freeman PROJECT: Coppell Town Center (name, address) W. Park Blvd. Coppell, Texas OWNER: City of Coppell TO: Howard U. Freeman, Inc. (Contractor) 1424 E. Grauwyler PO Box 1657 Irving, Texas 75060 CONIRACT FOR: General Construction CONSTRUCTION CHANGE AUTHORIZATION NO: DATE OF ISSUANCE: Five (5) June 13, 1986 ARCHITECT: O'Brien O'Brien Callaway 3131McKinney Ave., Suite 850, LB 113 Dallas, Texas 75204 ARCHITECT'S PROJECT NO: 8457 In order to expedite the Work and avoid or minimize delays in the Work which may affect Contract Sum or Contract Time, the Contract Documents are hereby ~amended as described below. Proceed with this Work promptly. Submit final costs forWork involved and change in Contract Time (if any), for inclusion in a subsequent Change Order. ,, Description: Provide and install vinyl tile and vinyl base in the following areas: 1. Corridor area 6. Property storage 150 2. Vestibule 156 7. Intoxilizer 153 3. Booking 157 4. Kitchen 158 5. Vestibule 162 Arstrong Excelon Tile #51836, White Shelter 1/8" Gauge Attachments: (Here insert listing ot documenls that support description.) The following is based on information provided by the Contractor: Method of Determining Change in the Contract Sum: Lump sum - not to exceed (lump sum, unit prices, cost plus fee or other) [] Fixed ~ Estimated [] Maxi m.u.~n . /"/ ,:. ~rc'hitect /O'Br~ Brien Callaway .[~ Fixed Change in Contract Sum of $ 650.00 (not to exceed) [] Estimated [] Maximum Change in Contract Time of --k/-- AUTHORIZED: CONFIRMED: BY BY Owner Date Contractor City of Coppell Howard U. Freeman days Date AIA DOCUMENT G713 · CONSTRUCTION CHANGE AUTHORIZATION ° MARCEl 1979 EDITION ' AIA® ©1979 · TEtE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVE., N.W., WAS~tlNGTON, D.C. 20006 G713- 1979 CONSTRUCTION CHANGE AUTHORIZATION AIA DOCUMENT G713 (Instructions on reverse side) Owner [] Architect [] Consultant [] Contractor [] Field [] Other [] City of Coppell O'Brien O'Brien Callaway Howard U. Freeman P ROJ ECT: (name, address) OWNER: Coppell Town Center W. Park Blvd. Coppell, Texas City of Coppell TO: Howard U. Freeman, Inc. (Contractor) 1424 E. Grauwyler PO Box 1657 Irving, Texas 75060 CONTRACT FOR: General Construction CONSTRUCTION CHANGE AUTHORIZATION NO: DATE OF ISSUANCE: Five (5) June 13, 1986 ARCHITECT: O'Brien O'Brien Callaway 3131McKinney Ave., Suite 850, LB 113 Dallas, Texas 75204 ARCHITECT'S PROJECT NO: 8457 In order to expedite the Work and avoid or minimize delays in the Work which may affect Contract Sum or Contract Time, the Contract Documents are hereby .amended as described below. Proceed with this Work promptly. Submit final costs forWork involved and change in Contract Time (if any), for inclusion in a subsequent Change Order. ,, Description: Provide and install vinyl tile and vinyl base in the following areas: 1. Corridor area 6. Property storage 150 2. Vestibule 156 7. Intoxilizer 153 3. Booking 157 4. Kitchen 158 5. Vestibule 162 A Ar.mstrong Excelon Tile #51836, White Shelter 1/8" Gauge ttachments: (Here insert listing of documents that support description.) The following is based on information provided by the Contractor: Lump sum- not to exceed Method of Determining Change in the Contract Sum: (lump sum, unit prices, cost plus fee or other) [] Fixed ~: Estimated [] Maximum /' ,;? '/~rchitect ~" // O' Brien~rien Callaway ]~/Fixed Change in Contract Sum ors 650.00 (not to e×ceed) [] Estimated [] Maximum ChanBe in Contract Time of --t/-- AUTHORIZED: CON FI RMED: BY BY Owner Date Contractor City of Coppell Howard U. Freeman day.~ Date AIA DOCUMENT G713 · CONSTRUCTION CHANGE AUTHORIZATION ° MARCH 1979 EDITION ° AIA® (D1979 · THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVE., N.W., WASHINGTON, D.C. 20006 G713- 1979 CONSTRUCTION CHANGE AUTHORIZATION AIA DOCUMENT G773 (Instructions on reverse side) Owner [] Architect [] Consultant [] Contractor [] Field [] Other [] City of Coppell O'Brien O'Brien Callaway Howard U. Freeman PROJECT: Coppell Town Center (name, address) W. Park Blvd. Coppell, Texas OWNER: City of Coppell TO: Howard U. Freeman, Inc. (Contractor) 1424 E. Grauwyler PO Box 1657 Irving, Texas 75060 CONTRACT FOR: General Construction CONSTRUCTION CHANGE AUTHORIZATION NO: DATE OF ISSUANCE: Five (5) June 13, 1986 ARCHITECT: O'Brien O'Brien Callaway 3131McKinney Ave., Suite 850, LB 113 Dallas, Texas 75204 ARCHITECT'S PROJECT NO: 8457 In order to expedite the Work and avoid or minimize delays in the Work which may affect Contract Sum or Contract Time, the Contract Documents are hereby amended as described below. Proceed with this Work promptly. Submit final costs forWork involved and change in Contract Time (if any), for inclusion in a subsequent Change Order. ,, Description: Provide and install vinyl tile and vinyl base in the following areas: 1. Corridor area 6. Property storage 150 2. Vestibule 156 7. Intoxilizer 153 3. Booking 157 4. Kitchen 158 5. Vestibule 162 AA~m~troqg Excelon Tile #51836, White Shelter 1/8" Gauge acnments: (Here insert listing ot documents that support description.) The following is based on information provided by the Contractor: Method of Determining Change in the Contract Sum: Lump sum - not to exceed (lump sum, unit prices, cost plus fee or other) [] Fixed ~/Fixed Change in Contract Sum ~:Estimated of $ 650.00 (not to exceed) [] Estimated [] Maximu't~ ,,/~. [] Maximum ISSU ~/" ,/~7~~ AUTHORIZED: CONFIRMED: ' ;~hilect ~/~'~ Owner Date Contractor O'BrLen O'~n Ca~Za~ay C~ty o~ Coppe~ ~o~a~d B. Free.an Change in Contract Time of --U-- days Date AIA DOCUMENT G713 · CONSTRUCTION CHANGE AUTIIORIZATION · MARCEl 1979 EDITION · AIA® ©1979 · THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NIW YORK AVE., N.W., WASHINGTON, D.C. 20006 G713-- 1979