Loading...
MA1009-LR130912 Concrete Compression Test Report 7636 Pebble Drive Fort Worth, Texas 76118 Tel: (817) 284-9400 Fax: (817) 589-9993 Client:Report Distribution:(90) kmarvin@coppelltx.gov City of Coppell (90) steve@jdkassoc.com Project: Erosion Control for Andy Brown (90) kdykes@tnpinc.com Park and Alex Drive Canal (90) asamaniego@coppelltx.gov Project No. MA10-09 (90) radloo@coppelltx.gov 687-13149-002 CMJ Report No.: (90) jelias@coppelltx.gov 09/17/2013 Report Date: Specifications Test Data 08/15/2013 1500 psi @ 28 DaysPlacement Date Strength n/aSampled ByCharlie Pearcy Slump n/aPartly Cloudy/Calm Air ContentWeather n/aRedimix/U4001561 Concrete TemperatureSupplier/Mix ASTM C231 n/aAir Content Method Ambient Temperature Field Data Set #01 2570897411:4412:50 Ticket Number:Time Batched:Time Sampled: 1 in1.0 % Slump:Air Content:Unit Weight: 10 of 30 Yardage (c.y.): 95° FAmbient Temperature: Concrete Temperature:92° F Stabilized Aggregate Wall Backfill, Sta. 4+50 to Sta. 3+50 Placement Location: Sample Location: Sta. 4+50 Concrete Compression Test Results CylinderAgeMax LoadAreaStrengthFracture Set ##Test Date(days)(lbs. force)(sq.in.)(psi)Type 01CEC08151301*08/22/2013 7 11240D-shear 12.63890 01CEC08151302*09/12/2013 28 14770A-cone 12.631170 01CEC08151303*09/12/2013 28 13750C-cone/shear 12.631090 01CEC0815130410/10/2013 56 28 day average 1130 Normal cylinder size: 4" x 8"; Fracture Types A,B,C,D,E=1,2,3,4,5 Respectively The average 28 day compressive strength test results do not meet specifications. Field and laboratory tests by CMJ are per applicable ASTM Standards: C31, C39, C138, C143, C172, C1064, and C617 or C1231. 0 Gallons of Water Added On-Site * 7-DAY TEST RESTULT INDICATES A MARGINAL 28-DAY COMPRESSIVE STRENGTH * 28-DAY TEST RESULTS NON-COMPLIANT; Hold cylinder will be tested at 56-days (*) Notifications: Keith Marvin with the city of Coppell, TX via email: kmarvin@coppelltx.gov and Albert Samaniego with the city of Coppell, Tx via email: asamaniego@coppelltx.gov Digitally signed by R. Carl Lee DN: cn=R. Carl Lee, o=CMJ R. Carl Lee Engineering, Inc., ou=CMT Department, email=clee@cmjengr.com, c=US Date: 2013.09.18 07:03:58 -05'00' CMJ Engineering, Inc R. Carl Lee, S.E.T. Vice President/CMT Manager LIMITATIONS: The test results presented in this report apply only to the specific samples, items, and areas described within this report. The test results do not pertain to any other samples, items or areas regardless of similarity. Our reports are produced solely for the exclusive use of our client. This report or any portion of this report may not be reproduced without the written consent of our client and CMJ Engineering, Inc. Page 1 of 1 01