DR1201-LR131014 (4) OCT-18-2013 05:00 P.04
AVA
Texas C T, Inc
Construction Materials Testing GEE Consultants, Inc.
and Environmental Consulting
10044-Monroe Drive • Dallas, Texas 75229 • (214) 352-6957 • Fax (214) 352-6972 • www .texascmt.com
GENERAL REPORT • CANCELLATION • STAND-BY
Report Date: Octpber 14,2013 Test Date: August 30,2013
Client: The Fain Group Cancellation/Stand-by Report No. 1
Project: Creekview Drive Roadway Improvements 2013 Project Number: 213-0134
Identification: Cancellation&Stand-by Page: 1 of 1
Results
Scheduled Time 1:00 to 1:30 PM,
Type of Service Scheduled: Concrete Testing on Row#5 18" Beam
Time Left Lab: 12:30 PM
Time of Verbally Cancellation to Later in Day: 1:20 PM
Time Returned to Lab: 1:45 PM
Time of Arrival Later in Day. 2:15 PM
Time Concrete Delivered at Site: 3:15 PM
Total Charged Time: 2.0 Hours
Reason:• Concrete delivery moved to 2:00 to 2:15
4/7"-"-' PM and then arrived on site an additional
one(1)hour late.
Technician: RG
cc: Mr.Larry Davis-City of Coppell,Phone:972-304-3684;via Fax:972-304-3570
Mr.George Marshall-City of Coppell,Phone:972-304-3562;via E-mail:gMasshall@coppelltx.gov
Mr.Rod Lacy-The Fain Group,Phone:817-927-4388;via E-mail:rlacy @faingp.com
Texas CMT,Inc. TBPE Firm: F-4521 Reviewed by:
All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of Texas CMT,Inc. The use of our name must receive
our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products.