Loading...
DR1201-LR131014 (4) OCT-18-2013 05:00 P.04 AVA Texas C T, Inc Construction Materials Testing GEE Consultants, Inc. and Environmental Consulting 10044-Monroe Drive • Dallas, Texas 75229 • (214) 352-6957 • Fax (214) 352-6972 • www .texascmt.com GENERAL REPORT • CANCELLATION • STAND-BY Report Date: Octpber 14,2013 Test Date: August 30,2013 Client: The Fain Group Cancellation/Stand-by Report No. 1 Project: Creekview Drive Roadway Improvements 2013 Project Number: 213-0134 Identification: Cancellation&Stand-by Page: 1 of 1 Results Scheduled Time 1:00 to 1:30 PM, Type of Service Scheduled: Concrete Testing on Row#5 18" Beam Time Left Lab: 12:30 PM Time of Verbally Cancellation to Later in Day: 1:20 PM Time Returned to Lab: 1:45 PM Time of Arrival Later in Day. 2:15 PM Time Concrete Delivered at Site: 3:15 PM Total Charged Time: 2.0 Hours Reason:• Concrete delivery moved to 2:00 to 2:15 4/7"-"-' PM and then arrived on site an additional one(1)hour late. Technician: RG cc: Mr.Larry Davis-City of Coppell,Phone:972-304-3684;via Fax:972-304-3570 Mr.George Marshall-City of Coppell,Phone:972-304-3562;via E-mail:gMasshall@coppelltx.gov Mr.Rod Lacy-The Fain Group,Phone:817-927-4388;via E-mail:rlacy @faingp.com Texas CMT,Inc. TBPE Firm: F-4521 Reviewed by: All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of Texas CMT,Inc. The use of our name must receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products.