Loading...
DR1201-LR131007 OCT-18-2013 . 05:02 P.13 A Tex s C `� T, Inc AVA Construction Materials Testing GEE Consultants, Inc. and Environmental Consulting 10044"Monroe Drive • Dallas, Texas 75229 • (214) 352-6957 • Fax (214) 352-6972 • www .texascmt.com REPORT OF CONCRETE MIX OBSERVATION Report Date: October 14, 2013 Date Concrete Placed: October 1, 2013 Standard 6'x12"Cylinders Client: The Fain Group Cylinder Cross-sectional Area:28.27 Square Inches Project: Creekview Drive Roadway Improvements 2013, Coppell, Texas Concrete Report No.: 18 • Contractor: The Fain Group Project No.:213-0135 Concrete Supplier and Plant: Redi-Mix Concrete/P259 Location of Placement: Eastbound Lane • MATERIALS Source/ SSD Batch Wts. OBSERVATION DATA Description (Lbs/CuYd) Mix Number: 10L11504* Time Sample Batched: 11:28 AM Cement: Time Sampled: 12:10 PM Fly Ash: Sample Location: Sta. 4+20 Truck/Ticket No: 1235/25736176 Coarse Aggregate: Temperature: Intermediate Aggregate: Ambient Range: . 86°F Fine Aggregate: Concrete Range: 87°F Admixtures: •. Slump Range(inches): 2.0 Weather Conditions: Clear . 1 NR Time Started: 6:00 AM 2 Air ' Time Completed: 1:45 PM Added Water: Sample Air Content(%): 3.5 Total Cubic Yards Placed: 230 Required Strength(Lbs./sq.in.): 4,000 Specimen Measured Age Date Total Load Compressive Strength Remarks • Number Slump(in.) (Days) Tested (Lbs.) (Lbs./Sq"In.) CV 63 3 r 10/4/13 121,580 4,300 CV 64 2.0 6 10/7/13 141,790 5,020 Test Methods Utilized Fracture Regular Cylinders Made By: MR ASTM C-31, C-39, C-143 (Unless Noted Otherwise) Remarks and/or Distribution: * Mix No. 10L11524 was used on September 24, 2013 for the westbound lane. ** Brian of The Fain Group was verbally informed on site of air test result. cc: Mr. Larry Davis - City of Coppell, Phone: 972-304-3684; via Fax: 972-304-3570 Mr. George Marshall -City of Coppell, Phone: 972-304-3562; via E-mail: gMarshall @coppelltx.gov Mr. Rod Lacy - The Fain Group, Phone: 817-927-4388; via E-mail: rlacy @faingp.com Texas CMT, Inc TBPE Firm: F-4521 " Reviewed by: .`// ' �1,4'`- �..:..... All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of Texas CMT,Inc. The use of our name must receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products. OCT-18-2013 05:02 P.11 A Texas CMT, Inc. Construction Materials Testing GEE Consultants, Inc. and Environmental Consulting 10044'Monroe Drive • Dallas, Texas 75229 • (214) 352-6957 • Fax (214) 352-6972 • www .texascmt.com REPORT OF CONCRETE MIX OBSERVATION Report Date: October 14, 2013 Date Concrete Placed: October 1,2013 Standard 6"x12"Cylinders Client: The Fain Group • Cylinder Cross-sectional Area:2827 Square Inches Project: Creekview Drive Roadway Improvements 2013, Coppell, Texas Concrete Report No.: 16 contractor: The Fain Group Project No.:213-0135 Concrete Supplier and Plant: Redi-Mix Concrete/P259 Location of Placement: Eastbound Lane • MATERIALS Source/ SSD Batch Wts. OBSERVATION DATA Description (Lbs/CuYd) Mix Number: 10L11504* Time Sample Batched: 9:11 AM Cement: Time Sampled: 9:53 AM Fly Ash: Sample Location: Sta.2+55 Truck/Ticket No: 1237/25736003 • Coarse Aggregate: Temperature: Intermediate Aggregate: Ambient Range: . 78°F Fine Aggregate: Concrete Range: 86°F Admixtures: Slump Range(inches): 1.5 Weather Conditions: Partly Cloudy . 1 NR Time Started: 6:00 AM 2 Air ' Time Completed: 1:45 PM Added Water: • Sartlple Air Content(%): 2.4** Total Cubic Yards Placed: 130 Required Strength(Lbs./sq.in.): 4,000 • Specimen Measured Age Date Total Load Compressive Strength Remar Number Slump(in.) (Days) Tested (Lbs.) (Lbs./Sq.In.) CV 57 3 10/4/13 126,940 4,490 a cylinders were m e per CV 58 6 10/7/13 135,160 4,780 equest of Brian of The Fain 1.5 roue. Test Methods Utilized Fracture Regular Cylinders Made By: MR _...-- ........."0// ASTM C-31,C-39,C-143 (Unless Noted Otherwise) Remarks and/or Distribution: * Mix No. 10L11524 was used on September 24, 2013 for the westbound lane. ** Brian of The Fain Group was texted the air test result. SYB foreman was verbally informed on site of air content. Additional air test was performed on Truck No. 1286 (180 cu.yd. Load) and the result was found to be 2.8%. cc: Mr. Larry Davis -City of Coppell, Phone: 972-304-3684;via Fax: 972-304-3570 Mr. George Marshall - City of Coppell, Phone: 972-304-3562; via E-mail: gMarshall @coppelltx.gov Mr. Rod Lacy - The Fain Group, Phone: 817-927-4388; via E-mail: rlacy @faingp.com • Texas CMT, Inc. TBPE Firm: F-4521 . Reviewed by: / = K .. All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of Texas CMT,Inc. The use of our name must receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products. OCT-18-2013 05:01 P.09 A Texas CMT, Inc. AYA Construction Materials Testing GEE Consultants, Inc. and Environmental Consulting 10044 Monroe Drive • Dallas, Texas 75229 • (214) 352-6957 • Fax (214) 352-6972 • www .texascmt.com REPORT OF CONCRETE MIX OBSERVATION Report Date: October 14, 2013 Date Concrete Placed: October 1, 2013 Standard 6"x12"Cylinders Client: The Fain Group Cylinder Cross-sectional Area:28.27 Square Inches Project: Creekview Drive Roadway Improvements 2013, Coppell, Texas Concrete Report No.: 14 Contractor: The Fain Group Project No.:213-0135 Concrete Supplier and Plant: Redi-Mix Concrete/P259 Location of Placement: Eastbound Lane • MATERIALS Source/ SSD Batch Wts. OBSERVATION DATA Description (Lbs/CuYd) Mix Number: 10L11504* Time Sample Batched: 7:04 AM Cement: Time Sampled: 7:47 AM Sample Location: Sta. 0+90 Fly Ash: Truck/Ticket No: 1269/25735854 Coarse Aggregate: Temperature: Intermediate Aggregate: Ambient Range: • 68°F Fine Aggregate: Concrete Range: 83°F Slump Range(inches): 1.75. . .. Admixtures: Weather Conditions: Clear 1 NR Time Started: 6:00 AM . 2 Air Time Completed: 1:45 PM • Added Water: 10 Gallons Sample Air Content(%): 1.5** Total Cubic Yards Placed: 30 . Required Strength(Lbs./sq.in.): 4,000 Specimen Measured Age Date Total Load Compressive Strength Remarks • Number Slump(in.) (Days) Tested (Lbs.) (Lbs./Sq.In.) CV 51 3 10/4/13 129,400 4,580 xt . ylinders were made p r CV 52 6 10/7/13 134,260 4,750 req st of Brian of The Fai 1.75 Grs^ p. . f +. Test Methods Utilized Fracture Regular Cylinders Made By: ' ASTM C-31, C-39,C-143 (Unless Noted Otherwise) . Remarks and/or Distribution: * Mix No. 10L11524 was used on September 24, 2013 for the westbound lane. ** SYB foreman was informed of air content. cc: Mr. Larry Davis -City of Coppell,Phone: 972-304-3684; via Fax: 972-304-3570 Mr. George Marshall- City of Coppell,Phone: 972-304-3562;via E-mail: gMarshall@coppelltx.gov Mr. Rod Lacy - The Fain Group, Phone: 817-927-4388; via E-mail: rlacy@faingp.com Texas CMT, Inc. TBPE Firm: F-4521 Reviewed by: aigice_____----.. All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of Texas CMT,Inc. The use osf our amen must receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently OCT-18-2013 05:00 P.07 A • Texas CMT, Inc. Construction Materials Testing GEE Consultants, Inc. and Environmental Consulting 10044 Monroe Drive • Dallas, Texas 75229 • (214) 352-6957 • Fax (214) 352-6972 • www .texascmt.com REPORT OF CONCRETE MIX OBSERVATION Report Date: October 14,2013 Date Concrete Placed: September 9, 2013 Standard 6"x12"Cylinders Client: City of Coppell Cylinder Cross-sectional Area:28.27 Square Inches Project: Creekview Drive Roadway Improvements 2013, Coppell, Texas Concrete Report No.: 09 Contractor: ARK Contracting Services Project No.:213-0134 Concrete Supplier and Plant: Redi-Mix Concrete/ P259 Location of Placement: Row#7 18" Beam MATERIALS Source/ SSD Batch Wts. OBSERVATION DATA Description (Lbs/CuYd) Mix Number: 10111524 Time Sample Batched: 12:28 PM Cement: Time Sampled: 1:15 PM Sample Location: Row 7 Beam,0'-25'W. of E. End Fly Ash: Truck/Ticket No: 1168/25723026 Coarse Aggregate: Temperature: Intermediate Aggregate: Ambient Range: • 89°F Concrete Range: 96°F Fine Aggregate: Slump Range(inches): 4.Q . . Admixtures: Weather Conditions: Partly Cloudy I Time Started: 12:15 PM . 2 Time Completed: 2:15 PM Added Water: Sample Air Content(%): Not Tested Total Cubic Yards Placed: 10 . Required Strength(Lbs./sq.in.): 3,000 Specimen Measured Age Date Total Load Compressive Strength Remarks Number Slump(in.) (Days) Tested (Lbs.) (Lbs./Sq.In.) CV 33 7 9/16/13 101,820 3,600 Arrived on site at 12:45 PM CV 34 28 10/7/13 110,440 3,910 to perform rebar re- 4.0 inspection. CV 35 28 10/7/13 121,340 4,290 CV 36 H Hold Test Methods Utilized Fracture Regular Cylinders Made By: MR ASTM C-31, C-39, C-143 (Unless Noted Otherwise) Remarks and/or Distribution: cc: Mr. Larry Davis- City of Coppell, Phone: 972-304-3684;via Fax: 972-304-3570 Mr. George Marshall- City of Coppell,Phone: 972-304-3562; via E-mail: gMarshall @coppelltx.gov Mr. Rod Lacy -The Fain Group, Phone: 817-927-4388; via E-mail: rlacy @faingp.com Mr. Ernie Fields- Walter P. Moore, Phone: 214-740-6251; via E-mail: efields @walterpmoore.com Mr. Mark North- ARK Contracting, Phone: 817-478-7400;via E-mail:mnorth @arkcontractingservices.com (.:Solt.,- eft__________ Texas CMT, Inc. TBPE Firm: F-4521 Reviewed by: All our prior written aspproval.the exclusive and use of the client to whom reports apply only to thesasample twested and/or bservedt and be are not nec aniy indicative of the quantities of apparently identical or similar products.name must