CF-Cozby Library-LR 940630I G
E GEE Consultants, inc.
2540 Glenda lane · Suite 108 · [Dallas, Texas 75220 · (214) 620-9791 · Fax (214) 620-9794
REPORT OF CONCRETE IV[IX INSPECTION
Repot~ Date: June 30, 1994 Data Concrete Placed: June lw 1994 Standard 6'x12'
Client: City of Coppell Area 28.27 Square Inches
~roject: W.T. Cozby Public Library
Contra,'tor: J.I. Burney Construction Company
Con~r=teSupplicrandPlanl: Texas Industries, Inc. - Plant #31
Lo~atlon of Placen~nt: Grade Beams
MATERIALS ~; ~o s.~ w~.
D~n4g~a (Ll~:CuYd, INSPECTION DATA
Mix Number: 8203 Time Sample Batched: 8:49 am
Cement: TXI UII Time Sampled: 10:00 am
F~y Ash: Sample Lo~ation: Column J-5
Truck/Ticket No:
_02/_.~,887
Coarse Aggregate: I' CS Temperemre:
Intermediate Aggregate: Ambient Range: 94°F
Fine Aggregate: Concrete Range: 90°F
Admixtures: Slump Range (inch=s): 4
Weather Conditions: Partly Cloudy
1 AEA Time Started: 9:45 am
2 Time Compl¢ted: 11:10 am
Added Water: 5 gal. Sample Air Content (%): No Test
Total Cubic Yards Placed: 6.0 C.Y.
Required Strength (Lbs./sq.in.): 3.000
spe~4tmm Measured A~g~ Da~ ToLal Lcsad C,c~nln~i~e Stngngth
Nung~r Slum~ I~,.l t, Duys ~ Test~l fLb~.l (Lbs.:Sq. ln.}
WTC 71 4 7 06/08/94 75,700 2,680
WTC 72 4 7 06/08/94 79,500 2,810
WTC 73 4 28 06/29/94 99,820 3,530
WTC 74 4 28 06/29/94 105,080 3,720
WTC 75 4 Hold Hold
Te~t Methods Utilized Frac~u.= a=a..~-r Cylinders Made By: K. MC.
AS'TM C-31.C-39.C-143 EUnkaks Nmed
Remarks and/or Distribution:
cc: Gary Sieb - City of Coppell
Larry Davis - City of Coppell
Mike Sherp£nskas - Diversified Cons~=ruction Services, Inc.
Jim Bullock - F & S Partners =//
Russell Williams - Brockette Davis Drake, Inc.