CF-Cozby Library-LR 940617E GEE Consultants, Inc.
2540 Glenda Lane · Suite 108 · Dallas, Texas 75229 * (214) 620-9791 · Fax (214) 620-9794
REPORT OF CONCRETE MIX INSPECTION
Report Date: June 17, 1994 Date Concrete Placed: May 19, 1994 Standard 6'x12'
Client: City of Coppell A~a 28.27 Square Inches
Project: W.T. Cozby Public Library
Contractor: Diversified Construction Services, Inc.
Concrete Supplier and Aa,t: Texas Industries, Inc. - Plant #41
Loeatioa of Placement: Exterior Grade Beams ( 2.6-B. 8 )
MATERIALS s~, ~s. a.~ w,,. INSPECTION DATA
Dc~'rlpd~n ~LI~.'CuYd )
Mix Number: 45 Time Sample Batched: 11:44 am
Cement: Time Sampled: 12:30 pm
Sample Location: GB2 (A.5-6,7)
Fly Ash: Track/Ticket No: 475/218336
Coarse Aggregate: I"C.S. Temperature:
Intermediate Aggregate: Ambient Range: 84°F
Fine Aggregate: Concrete Range:
Slump Range (inches):
Admixtures: Weather Conditions: Clear
I ADMIX Time Started: 11:45 am
2 Time Completed: 1:45 pm
Added Water: Sample Air Content (%): No Test
Total Cubic Yards Placed: 20.0
Rcqulred Strength (Lbs./sq.in.): 3,000
Spex.-irc~n Me~u~cl A~= Date Tom] Load Cot'nl~ive Sueng0t R=mark~
Nta~e~ Slunm {in. ~ (D~_~m J Tes~l (L~.~ (L~.. Sq.in.~
WTC 51 5½ 7 05/26/94 82,760 2,930
WTC 52 5½ 7 05/26/94 81,080 2,870
WTC 53 5½ 28 06/16/94 118,520 4,190
WTC 54 5½ 28 06/16/94 110,500 3,910
WTC 55 5½ Hold
Test Metheds Utilized g,actu~ geaum, Cylinders Made By: V. M ·
A~TM C-31,C-39.C-143 {Unk~s N(~xi Olh~.4s=l
Remarks and:or Distribution:
cc: Gary Sieb - City of Coppell
Larry Davis - City of Coppell
Mike Sherpinskas - Diversified Construction Services, Inc.
Jim Bullock- F & S Partners ..~ ..~/./~L)~
Russell Williams - Brockette Davis Drake, Inc. /_,/
gem Consultants, Inc. Reviewed by:
AIl leuem and mport~ ~ fo~ the cxclmi~e use of tbs cliem to ~/ec~ tl~9. a~ addmms~ and s~ ~ ~ ~ ~ ~ ~ ~ ~ G~ C~. ~. TIe use of our nam: nm~t .~x:i~