Loading...
CF-Cozby Library-LR 940617 (2)G EOTECHNICAL ENGINEERING GEE Consultants, Inc. E 2540 Glenda lane · Suite 10g · Dallas, Texas 75229 · (214) 620-0791 · Fax (214) 620-0794 REPORT OF CONCRETE MIX INSPECTION Report Date: June 17, 1994 Date Concrete Placed: May 18, 1994 Standard 6'x12' Client: City of Coppell Ar~a 28.27 Square Inches Project: W.T. Cozby Public Library Contractor: Diversified Construction Services, Inc. Concrete Supplier and Plant: Texas Industries, Inc. - Plant #41 Location of Placement: Piers MATERIALS s~.. ~.,~,,,i~ ~t~c.w, INSPECTION DATA Mix Number: 8203 Time Sample Batched: 10:08 am Cement: Time Sampled: 11:10 am Fl)' Ash: Sample Location: Front side of building, west pole Truck/Ticket No: 427/217386 Coars~ Aggregate: 1 'C.S. Temperature: Intermediate Aggregate: Ambient Range: 84°F Pine Aggregate: Concret~ Range: 78°F Admixtures: Slump Range (inches): 2~ Weather Conditions: Clear I ADMLX/AEA Time Started: N/A 2 Time Completed: N/A Added Water: Sample Air Content (%): No Test Tolal Cubic Yards Placed: 2.0 Required Strength CLbs./sq.in.): 3.000 Spech~-n Me~u~u Age I)a~ Total Load Comlne~ive S~h Numar SImnD, WTC 46 2¼ 7 05/25/94 92,260 3,260 WTC 47 2¼ 7 05/25/94 92,220 3,260 WTC 48 2¼ 28 06/15/94 95,000 3,360 WTC 49 2¼ 28 06/15/94 124,160 4,390 WTC 50 2¼ Hold T.s, ~,~ods t'dEzca F.~au~= Rea~ar Cylinders Made By: V.M. ASTM C-3hC-39.C-143 .Unless No~d O,3n=r~L~j ' Remarks and/or Dist~bution: CC: Gary Sieb - City of Coppell Larry Davis - City of Coppell Mike Sherpinskas - Diversified Construction Services, Inc. Russell Williams - Brockette Davis Drake, Inc. / ~ Consultants, Inc. Reviewed by: . All t-tt~m and ~eport~ am fo~ I{~ ~tclusiv~ us~ of th~ cllgm lo v/t~m ~ am addnmeed ami shall not hu nWn'~,.-,~_ without 0~ full a{~nc~tl of GEE Co~tanl~, Inc. 'The v~e of our r. amu must ~ive mar prior wtimm api~oval. Ou~ I~tt~m and ~ a~y only ~o ~h~ sampim u~,-.a and/o~ ~ and a~ not n,~es~ily indicativ~ of th~ quantitie~ of agl~m~naly idmaic~l or si~il~, product~.