Loading...
CF-Cozby Library-LR 940620I G E GEE Consultants, inc. 2540 Glenda Lane · Suite 108 · Dallas, Texas 75229 · (214) 620-9791 · Fax (2141 620-9794 GENERAL REPORT Report Date June 20, 1994 Inspection Date June 17, 1994 Client City of Coppell Project W.T. Cozby Library Coppell, Texas Identification Reinforcing Steel Inspection Method of Test Visual Inspection Page #1 of 1 Results On June 17, 1994, reinforcing steel was inspected at the following locations by a representative of GEE Consultants, Inc.: 1~t floor slab on-grade-west half of building The following discrepancies were noted and called to the attention of Charlie, a representative of J.L. Burney Construction: 1. Dowels in construction joint to be placed later 2. Chairs to be placed later The above discrepancies will be corrected as noted prior to concreting. Concreting not scheduled on this date. Technician: K.Mc. cc: Gary Sieb - City of Coppell Larry Davis - City of Coppell Mike Sherpinskas - Diversified Construction Services, Inc. Jim Bullock - F & S Partners Russell Williams - Brockette Davis Drake, Inc.