CF-Cozby Library-LR 940615J G EOTECHNICAL
ENGINEERING GEE Consultants, Inc.
E INVIRONMENTAL
2540 Glenda Lane · Suite 108 · Dallas, Texas 75229 · (214) 620-9791 · Fax (214) 620-9794
REPORT OF CONCRETE MIX INSPECTION
Report Date: June 15, 1994 Date Concrete Placed: June 7, 1994 Standard 6'x12"
Client: City of Coppell Ar~a 28.27 Square Inches
Project: W.T. Cozby Public Library
Contractor: Diversified Construction Services, Inc.
Concrete Supplier and Plant: Texas Industries, inc. - Plant #41
Location of Placement: Columns
MATERIALS ~,' ss~ ~,t~w,,. INSPECTION DATA
Descflp6on (13~/CuYd)
Mix Number: 8203 Time Sample Batched: 3:44 pm
Cement: Time Sampled: 4:05 pm
Fly Ash: Sample Location: Column A-4
TmclUTicket No: 8612"6388
Coarse Aggregate: I ' CS Temperature:
Intermediate Aggregate: Ambient Range: 102°F
Fine Aggregate: Concrete Range: 93°F
Admixtures: Slump Range (inches): 61/:
Weather Conditions: Partly Cloudy
I AEA Time Started: 2:30 pm
2 Time Completed: 5:40 pm
Added Water: 5 gal. Sample Air Content (~): No Test
Total Cubic Yards Placed: 10.0 C.Y.
Required Strength (Lbs./sq.in.): 3,000
S peciaz~-n't Me~uted Age Da~ Total Load Corr. pmaslve
N t.~nber Sltnnp 6n.~ Davs~ Tc~ted !13~.~ .:Lb~..'S~. L'~.:
WTC 81 6½ 7 06/14/94 78,790 2,790
WTC 82 6½ 7 06/14/94 70,400 2,490
WTC 83 6½ 28 07/05/94
WTC 84 6% 28 07/05/94
WTC 85 6½ Hold Hold
Test Metho~ Utilized Fracture Regular
ASq'M C-31.C-39. C-143 !Unions Nc, tea O,h:,,,,~ Cylinders ,Made By: K. Mc.
Remarks and/or Distribution:
cc: Gary Sieb - City of Coppell
Larry Davis - City of Coppell
Mike Sherpinskas - Diversified Construction Services, Inc.
u.oc -
Russell Williams - Brockette Davis Drake, Inc.
G~ ~onsultants, Inc. Rewewed by: i '
All ~:t~m an~ repo~ a~ fo~ tbs: cxclmiv~ me of ~ ¢[km to t,..haa 0~/tn aklm~d and shnll not I~ ~ ,,,ithoa 0~ full aleX,'al of GEE C~mm~. Inc. ~ use of our nam~ must ~i~
ou~ Wior ~n'iuea .a~,mval. Out, Ict~m ~ ~ apply only to O~ samplo tmtod and/or inslzz:ml and am nm notx~atOy indimtiv~ of th~ quanfifi~ of aplxuently idmaical ee sim~ pmdu~.