Loading...
CF-Cozby Library-LR 940601 (2) G E OTECHNICAL E GEE Consultants. Inc. 2540 Glenda Lane · Suite 10g · Dallas, Texas 75229 · (214) 620-9791 · [ax (214) 620-9794 GENERAL REPORT Report Date June 1, 1994 Inspection Date May 14, 1994 Client City of Coppell Project W.T. Cozby Library Coppell, Texas Identification Shop Inspection @ WeeBe Industries - Fort Worth, Texas Method of Test Visual Inspection Results On this date a representative of GEE Consultants, Inc. was present at the above referenced fabrication plant to perform visual inspection of fabricated structural steel. 1. On arrival the shop drawings and specifications were reviewed. Copies of the welders qualifications were not available in the shop office and will be submitted at a later date. 2. Sequence/ti structural steel is in various stages of fabrication, to include tubular columns, angles, channels and beams. 3. Nine 6" diameter galvanized columns #26C 1 which are finished were found to be satisfactory.. 4. The shop welds were visually examined for size and appearance and were found to be acceptable. Workmanship is progressing in a satisfactory, manor. Our inspection was performed in accordance with.p.r, oject drawings and specifications. ../.,/,-.- · cc: Gary Larry Davis - City of Coppell Mike Sherpinskas - Diversified Construction Services, Inc. Jim Bullock - F & S Partners Russell Williams - Brockette Davis Drake, Inc.