Loading...
CF-Cozby Library-LR 940606 (2) E GEE Consultants, Inc. 2540 Glenda lane · Suite 10g · Dallas, Texas 75229 · (214) 620-9791 · Fax (214) 620-9794 GENERAL REPORT Report Date June 6, 1994 Inspection Date May 31, 1994 Client City of Coppell Project W.T. Cozby Library Coppell, Texas Identification Reinforcing Steel Placement Method of Test Visual Inspection Page/ti of I Results On May 3 I, 1994, reinforcing steel was inspected at the following locations by a representative of GEE Consultants, Inc.: Pier Caps at: A-4, A-5, A-6, A-7, A-8, A-9, A, 10, A-Il, L-6.5, and L-7.5 The following discrepancies were noted and called to the attention of Mike Sherpinskas, a representative of Diversified Construction. No cartons used Pier caps shortened - only 3 #3 ties @ 6" - Cuttings removed as directed Due to only 3" of pier cap overhang beyond the pier, no carton forms were used. The remaining discrepancies were noted or corrected. Technician: K.Mc. cc: Gary Sieb - City of Coppell ~/~ ~ ~//~ Larry Davis - City of Coppell -~&M.~_~_~~c~_.~ · Mike Sherpinskas- Diversified Constmction~I'fic.- Jim Bullock - F & S Partners Russell Williams - Brockette Davis Drake, Inc.