Loading...
SS9402C-CN 960513 214 960 4471 - MPY 14 '96 06:39AM HDR ENGR DEPT 37 (214)960-4471 P. 1/5 FACSIMILE TRANSMISSION .A. DELIVER TO: ^ 2 • v NAME Jim Witt, City Manager COMPANY City of Coppell FAxNUMBEA 304-3570 FROM NAME Bill Hindman TELEPHONE 960-4400 DATE May 13, 1996 TOTAL PAGES 5 IF YOU EXPERIENCE PROBLEMS WITH THE RECEPTION OF THIS DOCUMENT,PLEASE CALL 214 960-4400. MESSAGE: Attached is an executed agreement for the Bethel Road Sewer Improvement Project. As a result of this agreement, we have executed an agreement with a construction contractor to begin construction immediately. HDR Engineering,Inc. Suite 125 Telephone 12700 Hillcrest Road 214 960-4400 Dallas,Texas Fax 75230-2096 214 960-4471 05/lit%X04 '96 y 86 9AM HDR E MGR DEFT 37� z 1.4.).29-44Z14 960 4471 tP 2 5� DO2 em/13/yG JP.A..P.MLNN u t LLPMrcL hnuC'. . r `„yr�CL-. w. i Ewa'c.v-r lIALIAS COUNTY = i E OF AGREEMENT was Aiall SWIM is made by and between the City of Coppell, Texas (hereinafter ragweed to as the"City) and HDR Engineering; Inc. (hereinafter referred to es 'kIDR"). RECITALS VIIIESEAn,MDR entered into an a&eemeot with the City dated October 25.1994 to design sanitary sewer improvements Project No.SS9402-Grapevine Creek III.W and Bethel Road SS SS94-02B and SS94-02C the City(hereinafter referred to as "Original IRiAS,it has been determined that appsozimately 3250 feet of said sanitary sneer Roe is tuRmired to be reconstructed between Station 42+5237 and Stettin 75+02.71, and IIIINIMAS, the City bas requested HDR to redesign the said sanitary sewer liwa, and wewinet and pay for the costs of reconstructive of the aforementioned pardon of sanitary saver Was PIdR 011 , in consideration of the mutual covenant contained herein and other seed aed%unable consideradmt, it is agreed as follows: 1. 14DR agrees to contract for the reconstruction of approximately 3250 feet of serer line$594412C along Bethel Road,west of Freeport Parkway(the )in accordance with City standards subject to the approval of the City Engineer or Iris dwi/e■ei 2. MDR agrees to pay the full cost of the reconstruction described in paragraph 1 to the Caesar= employed to complete said recd struetiam (the : 3. In order to compensate HDR for the costs ioanrcd in aaaodatian with the yrdeesionah services =adored including the administration of the Reconstruction v r4 r this agreement,the Qty shalt pay to HDR within thirty (30) days of invoice and pigment by HDR that amount which represents the difference between the mount paid to the Contractor fur the completion of the Reconstruction as described in Via agreement, and the Seed sons of$100,000. 4. If the amens to be paid to HDR in accordance with paragraph (3) of this Agreement is in excess of$15,000, the payment and comp1:con of&Is contract will be subject to the prior written approval of the City Manager. 5. IU agrees to redesign,at no cast to the City,the 3250 feet of sewer line 5394-02C to meet minimum State of Texas standards for sewer line slopes using seaway 05/MAC 4.4 '961064:,)46P11 `DR E err `DUEP G,�7c(, 14)460-44ci4 960 4471 hu 3e o2 D03 0 5/13.'36 14:5.1 N 1 CWA.S J L. LurrtLL L L L Y nu. (C5 p '10644 accepted Ong practices. Based on these Standards, it is anticipated that approximately imately 2715 feet of the sewer line will be 15 inch is size on a 0.1595 dope and approximately 475 feet of the sower line will be 12 inch in we on a 020%dope. 6. } 'green to prepare and submit two site plans acceptable to the City Manager fora recreation annex on the site currently occupied by the Oty's Fire station on Mona 1toad. One plan will display the design and plan for the natation meta on the south side of the existing Fire Station Facility.and one plan will show the design and plan for the recreation center on the west side of the existing Fire Station Fae ility. Both site plats will be required to be submitted no later than thirty (30) daps after the date of this agreement Both site plans hm>wst comply with the site plan regal:a nent, as set forth by the City Manager. Failure to produce said site plans within the period described above, and to the satisfaction of the City Manager, will reaslt in a breach of this providoo,and will automatically nurse the City to withhold hap to Mon *misled($15.000) of any amount owed to HEM. 7. The validity at this Agreement and any of its terms or provisions,as well as the rights aid duties of the parries,shall be governed by the laws of the State of Texas,and any vet re for am stoat owing this Agree:a nt shall be in Dallas County, Two. t Tads Agreemect maybe amended by the trial agreement of the parties to it, in suiting and aged to and incorporated in this Agreement. 9. Is the event that arty and or mare of the provisions contained in the Agreement shall for -y reason be held to be invalid, illegal, or unenforceable in any respect, such banality.m.plity,or unenforandsairy ahaU not effect the other provision',and the Agreement shall be Goastsatd as if such invalid, illegal, or=enforceable provision had never been contained in it. II No Reconstruction work shall be commenced until the plans and spoafittoas thereof have been approved in wig by the City. 11. No Reconstruction work shall be aommeocod until the coats to construct such have bun approved in writing by all parties. 12. All recitals to this Agreement are incorporated into and made a part of this Aghaemern for all purposes. 13. Any notice or communicadoe required or permitted hereunder shag be given in wide& sent by(i)Peel delivery, or(h) expedited delivery service ahrac h proof of &boo !, or (iii) united States man. Podolia PrePeld• is er rte at its address set forth ' " ream receipt requested. addecssed to the appropriate party 0o the stastare page of this Agreement or to such other addreha or to the attend= at such other person as hereinafter shall be desigod in writing by the applicable pee" —t in accordance herewith. Any cub course at communication stall be deemed to have been given, whether actually received or not when sent or 05/7. 4.4 '961D04y40AM HDR ENGGR�DEFT 37`±214)960-44714 960 4471 tP 4152 D04 e5/13/96 14:54 NICH LS SACKSON DILLARD LAGER. . . 4 CDPPELL CITY NO.7?9 P004,004 itched in the manner provided bareia. 14. Tins Agreement is binding upon and inures to the benefits of the parties hereto and their respective summon and assigns. 1S. This Agreement does not affect or alter the obligations or respous1'bilid$s of HDR under the 'Original Agraaoent" and any other agreements with the City. A. Other than as contained in this Assonant,HDR shall have no other responsibility or Mighty for the cats or other dam relating to or arising out of the ReaoenWetioa In addition, HDR shall have no respon ility or liability for work reformed by the Ws=tractor not constructed in accordance with the plans and prepared ipsoincatioso nausea MDR i md , harmless and defend M from against any such claims. !i s WIEREOF,the alp and HDR have sired this Agreement tkis 131- thy aI Wisp, 1996. CITY OF «01'• a 11 • a. my mampr ass - . I , Boulevard P.O. Seat 478 CoppeU, Teems 75019 IWR ENGINEERING, INC. William Imo. Sr. Vice President 12700 Merest est Road Suite 125 WBas, Tee 75230-2098 ANWZMO3 AS TO FORM: O. dtb, Ct Attorney /v1 05/10/!6) MAY 14 '96 06:41AM NSF, ENGR DEPT 37 J.214)960-4471.,, for, •.4(1 P_5i54 VU1 P.Q box 478 Coppef,Texas 75019 c., 3'' -./.e_trr, /,__ _ 4) ,z_____a::1 The G+ty With A Beautiful Future 214462-0)22 e.O-Sex 478 Copper.Texas 75019 6 May 13, 1996 VIA FAX 214-960.4471 Mr. Bill Hindman Senior'Vice President MDR Engineering 1270 Hillcsest Road, Suite 125 Dallas, Texas 75230-2096 Re: satbakzumnsmanummicutinitg Dear Mr. Sandman: In accordance with our recat conversations, I hereby acknowledge that the contract for the reconstruction of the Bethel Road Sewer Improvement Project is $142,900. The City of Coppell, in accordance with our Ageentent dated May 13, 1996, is responsible for 542,900 of this contract. Any amatuit above this figure will be subject to approval by the City Manager's Office. If you have any questions regarding this matter, pkase feel free to contact niy office. . _ . y, - nn Witt City Manager IW:kar hdrengr.513 cc: Pete Smith Ken Griffin 05/08/96 14:28 NICHOLS JACKSON DILLARD HAGER. . . 4 CITY OF COPPELL NO.660 P005/005 NICHOLS,JACKSON, DILLARD, HAGER & SMITH MEMORANDUM TO: Jim Witt FROM: Peter G. Smith DATE: May 8, 1996 RE: HDR Contract Actual construction cost of project $345,454.69 2% of above $6,909.09 Actual cost of construction resulting from negligence $126,033.92 (removal and replacement costs) (part 1) Estimate of such costs would have been at signing contract $18,656.25 (part 2) If the owner accumulates excess costs over 2% of actual project construction costs ($6,909.09), Engineer bears burden of such cost over 2% (6,909.09). i.e. $126,033.92- $6,909.09 = ($119,124.83) less cost City would have paid if project was designed properly $18,656.25 = ($100,468.58). Not to exceed difference of actual cost of negligent construction $126,033.92 and estimate of such cost would have been at contract signing $18,656.25 = $107,377.67: Liability of HDR limited to $100,468.58. Recommendation: Have HDR contract to have work done with zero exposure to the City or take $100,468.58. However, all the figures in the above calculations are subject to disagreement therefore, $100,000 offer by HDR is good. AGGOg56A