SS9402C-PR 960510 214 960 4471
MAY 10 '96 08:53AM HDR ENGR DEPT 37 (214)960-4471 P.1/2
Fix .fit
FDR,
Date 05-10-96
Number of Pages(includes cover page) 2
AM• •To
I Name Ken Griffin/Mike Martin I Telecopy number called 214-304-3673
L Firm Engineeriuf
I City Coppell I State TX
If you do not receive all the pages, please call 214-960-4400 as soon as possible.
From
I Name Joe Ezzell I Department 037
I Telephone 214-960-4416 I Job Number 08015.001.037
Here is a breakdown of the unit prices proposed by Mike Albert Construction.
WWI Engineering,Inc. 12700 Hillcrest Road Telephone
Suite#125 214-960-4400
Dallas,Texas Fax
75230-2096 214-960-4471
....,........ __,._.� 21- ....e...e 1:n. 6gYroorinpe k'4
°:1"'L h1AY 1 '96 08 53AM HDR ENGR DEPT 37 (214)J60-4471''°° c"w.ezzeu PEP 2/2
MIKE ALBERT, INC. 05/09/96
*******thNseme wy*******7t*VeAYe4roG"A`rrg******fkfYYefkfifl9tvRYC'k1********nhlnFXflSe*Vota l******* ****Ak ekfk*********InSW*Ve********MY 5
POKE ALBERT, INC
JOB NO.^MA-690
PROJECT SANITARY SEWER lin BETH EL ROAD
LOCATION.COPPELL
BID DATE_APRIL 22, 1996 REVISED May 9, 1996
***,„,*'*iM'******9W„***********..,„ „.,*'**.,kfkY,,,,,********....Y Y4*,,,,e eRQ9ef,„t*********.l.k.th.1'ir9********k'k**********7kf[*1-kf**,
ITEM UNIT QUANTITY DESCRIPTION UNIT TOTAL
COST COST
]F%'*'it'kY6WY�'k�k!!1ll Nf M'yCX`I.**�'1'4�ekkili'AYC***'X*`YYIk'i'fie'Yl lnt Rle1%x*i�*'k*YCfk'Y�FlleflrlkVe4Pri"k*7l'A'%�'W*'**'k�lF4fie @YNnhM7Fnt1rW'RAC'kYC'fi*9L�tX'*'k**ILYfle9l4RfTAlhiklFllri
1 LF 475.00 12" SDR 35 SEWER 34.65 16,458.75
2 LF 2715.00 15" SDR 35 SEWER 36.09 97,984.35
3 EA 9.00 4'dia MANHOLE 2300.00 20,700.00
4 SF 100.00 6" R.C. RIPRAP 4.00 400.00
5 LF 3190.00 TRENCH SAFETY 1.00 3,190.00
6 BY 900.00 HYDROMULCH SEEDING 1.50 1,350.00
7 MO 2.00 BARRICADES 1000.00 2,000.00
*fR*„,„***&**4f4**4,,,„., .*"*„.,.9,,,,„v,*k*fkyr****RWNSC ******L YrYera*****4.-**MfkfYf4>pf{****flitat'W'****'****..** **.*
142,083.10
ENCL.LIMNS:
1. ENGINEERING
2. DENSITY TESTING
3. PAVEMENT REPAIR
4. STORM WATER PERMIT
5. INSPECTION FEES
INCLUfRS:
1. BOND
2. APPLICABLE TAXES
3. LEAVING SUBGRADE +/-0.2 ft
4. HAUL OFF OF EXCESS SPOILS
5. BARRICADES
6. EROSION CONTROL DEVICES
7. COMPLETEING OUR WORK IN 30 WORKING DAYS
AUA1- 1CATIONS:
1. BASED ON CASTING THE TRENCH EXCAVATION
TO THE NORTH SIDE OF THE EXISTING ROADWAY
IF YOU HAVE ANY QUESTIONS, PLEASE CALL 817-577-8805 or MOBILE 214-215-0733.