Loading...
SS9402C-PR 960502 .bee/ e ® _l _ FILE COP Y C / V // ° ,PP.O.Box 478 ( ///L/ Coppell,Texas 75019 C The City With A Beautiful Future 214-462-0022 P.O. Box 478 c2 Coppell,Texas 75019 May 2, 1996 Mr. Bill Hindman Senior Vice President HDR Engineering 1270 Hillcrest Road, Suite 125 Dallas, Texas 75230-2096 Re: Bethel Road Project Dear Mr. Hindman: We received your latest agreement regarding the reconstruction of the sewer line along Bethel Road. Based upon a review of that agreement, I am submitting to you a counter-proposal which includes HDR Engineering contracting to reconstruct of 2775 feet of line and limiting maximum exposure for the City to $15,000, related to the reconstruction of 475 feet of sewer line. We must limit the risks the City could incur during the reconstruction to $15,000, for any amount over that number would be viewed as a violation of state law regarding purchasing and contracting per our City Attorney's instructions. We appreciate HDR's continued attempts to resolve this matter, but feel these terms must be met in order for us to proceed in an expedient and non-adversarial manner. Please contact me if you have any further questions regarding our position. Once again, we appreciate your continuing efforts to resolve this matter. R- �; tfully, 1 fm Witt ity Manager JW:kar hdrengr.502 AGREEMENT THIS AGREEMENT is made by and between the City of Coppell, Texas ("City") and HDR Engineering, Inc. ("HDR"). WHEREAS, HDR entered into an agreement with City dated November 8, 1994 to design sanitary sewer lines for the City, and WHEREAS, it has been determined that approximately 3250 feet of the Bethel Road section(SS 94-02C) of sanitary sewer line is required to be reconstructed, and WHEREAS, HDR has contracted to pay for 2775 feet (Sta. 75+03 to Sta. 47+27) of the sanitary sewer line, and WHEREAS, the City desires to employ the same contractor to install the remaining 475 feet (Sta. 42+52 to Sta. 47+27). NOW THEREFORE, in consideration of the mutual covenant contained herein and other good and valuable consideration, it is agreed as follows: 1. HDR agrees to contract for the reconstruction of approximately 2775 feet (Sta. 75+03 to Sta. 47+27) of sanitary sewer line east of the U.S. Bulk Postal Facility. 2. The City agrees to pay directly to the contractor selected by HDR or reimburse HDR the reconstruction costs for 475 feet (Sta. 42+52 to Sta. 47+27) of sanitary sewer line, so long as the City's total cost does not exceed $15,000. 3. Items 1 & 2 constitute the entire agreement between HDR and the City of Coppell concerning the Bethel Road section SS 94-02C, between Sta. 42+52 and Sta. 75+03. IN WITNESS WHEREOF, the City and HDR have signed this Agreement this day of May, 1996. City of Ce spell, Texas HDR Engineering, Inc. i !/1 b un Witt, City Manager by: William Hindman, Sr. Vice President j