Loading...
CF-Cozby Library-LR 940613 (3)J G EOTECHNICAL ENGINEERING GEE Consultants, Inc. F 2540 Glenda Lane · Suite 108 · Dallas, Texas 75220 · (214) 620-9791 · Fax (214) 620-97~4 REPORT OF CONCRETE MIX INSPECTION RcportDatc: June 13, 1994 Dale Concrete Placed: June 1, 1994 Standard6'xl2" Client: City of Coppell Area 28.27 Square Inches Project: W.T. Cozby Public Library Contractor: J.I. Burney Construction Company Concrete Supplier and Plant: Texas Industries, Inc. - Plant #31 Lo~ation of Placement: Grade Beams MATERIALS ~, ~o ~ w~. ~.~i~, ~.,'c~va, INSPECTION DATA Mix Number: 8203 Time Sample Batched: 8:49 am Cement: TXI I/II Time Sampled: 10:00 am Fly Ash: Sample Location: Column Truck[rickct No: 202/222887 Coarse Aggregate: l" CS Temperature: Intermediate Aggregate: Ambient Range: 94°F Fine Aggregate: Concrete Range: 90°F Admixtures: Slump Range (inches): 4 Weather Conditions: Partly Cloudy I A£A Time Started: 9:45 am 2 Time Completed: 11:10 am Added Water: 5 gal. Sample Air Content (%): No Test Total Cubic Yards Placcd: 6.0 C.Y. Required Strength (Lbs./sq.in.): 3,000 sgecin~a Me~med Ale Da~ Tmal ~ Comln~iv~ P. ematl~ Numi~r Slump [ in. I (Days I Teated (LI~.) (Lb .. Sq. In. J WTC 71 4 7 06/08/94 75,700 2,680 WTC 72 4 7 06/08/94 79,500 2,810 WTC 73 4 28 06/29/94 WTC 74 4 28 06/29/94 WTC 75 4 Hold Hold Teat Melhcds L",iliz~ Fracum~ P~aular Cylinders Made By: K. Hc, ASTM C-31,C-39.C-143 (L'nk~s Ncn~d Oth~rsads~} Remarks and/or Distribution: CC: Gary Sieb - City of Coppell Larry Davis - City of Coppell Hike Sherpinskas - Diversified Conetruction Serv£9~s, Inc, Jim Bullock - F & S Partners // . Russell Williams - Brockette Davis Drake, Inc. ~ /~ // --Con.nltants, Inc. R evie,ed by: