REPORT OF CONCRETE MIX INSPECTION
RcportDatc: June 13, 1994 Dale Concrete Placed: June 1, 1994 Standard6'xl2"
Client: City of Coppell Area 28.27 Square Inches
Project: W.T. Cozby Public Library
Contractor: J.I. Burney Construction Company
Concrete Supplier and Plant: Texas Industries, Inc. - Plant #31
Lo~ation of Placement: Grade Beams
MATERIALS ~, ~o ~ w~.
~.~i~, ~.,'c~va, INSPECTION DATA
Mix Number: 8203 Time Sample Batched: 8:49 am
Cement: TXI I/II Time Sampled: 10:00 am
Fly Ash: Sample Location: Column
Truck[rickct No: 202/222887
Coarse Aggregate: l" CS Temperature:
Intermediate Aggregate: Ambient Range: 94°F
Fine Aggregate: Concrete Range: 90°F
Admixtures: Slump Range (inches): 4
Weather Conditions: Partly Cloudy
I A£A Time Started: 9:45 am
2 Time Completed: 11:10 am
Added Water: 5 gal. Sample Air Content (%): No Test
Total Cubic Yards Placcd: 6.0 C.Y.
Required Strength (Lbs./sq.in.): 3,000
sgecin~a Me~med Ale Da~ Tmal ~ Comln~iv~
P. ematl~
Numi~r Slump [ in. I (Days I Teated (LI~.) (Lb .. Sq. In. J
WTC 71 4 7 06/08/94 75,700 2,680
WTC 72 4 7 06/08/94 79,500 2,810
WTC 73 4 28 06/29/94
WTC 74 4 28 06/29/94
WTC 75 4 Hold Hold
Teat Melhcds L",iliz~ Fracum~ P~aular Cylinders Made By: K. Hc,
ASTM C-31,C-39.C-143 (L'nk~s Ncn~d Oth~rsads~}
Remarks and/or Distribution:
CC: Gary Sieb - City of Coppell
Larry Davis - City of Coppell
Hike Sherpinskas - Diversified Conetruction Serv£9~s, Inc,
Jim Bullock - F & S Partners // .
Russell Williams - Brockette Davis Drake, Inc. ~ /~ //
--Con.nltants, Inc. R evie,ed by: