Loading...
DR1201-CR131014 T H E • C 1 T Y • O F COPPELL 0 fir:.._ „-• DAILY CONSTRUCTION REPORT PROJECT: CREEKVIEW DR RETAINING WALL&ROADWAY DATE 1 Q11 l y z DREPORT# IMPROVEMENTS � DAY IVIT fW IT IF IS IS I PROJECT NO. DR 12-01 WEATHER SUN CLEAR OVERCAST aii0 SNOW OWNER: CITY of COPPELL TEMP To 32 �3322-�-550�0 t 70-85 85 up WIND Still yviou) High Overtime Form CONTRACTOR: FAIN GROUP HUMIDITY Dry Mod HIM) Submitted? Y /N PROJECT INSP: LARRY DAVIS AVERAGE FIELD FORCE NAME OF NON-MANUAL MANUAL REMARKS CONTRACTOR/SUBCONTRACTOR VISITORS TIME REPRESENTATIVE REPRESENTING REMARKS EQUIPMENT AT THE SITE: CONSTRUCTION ACTIVITIES: 3a l Y 4, 1 /�ZZ,-✓17444 --A- Prot.A— 30940101 firtlykes g dt,/ ?yd -tA�W l i` pie p 7: SIGNATURE ENGINEERING INSPECTOR