Loading...
DR1201-CR131015 T H E • G 1 T Y O F COPPELL s,_ o A s J . ' a DAILY CONSTRUCTION REPORT PROJECT: CREEKVIEW DR RETAINING WALL&ROADWAY DATE I o iI 1 REPORT# IMPROVEMENTS f' DAY jM I(Yw IT IF Is � S PROJECT NO. DR 12-01 WEATHER SUN CLEAR OVERCAST SNOW OWNER: CITY of COPPELL TEMP To 32 32-50 �i 70-85 85 up WIND Still High Overtime Form CONTRACTOR: FAIN GROUP HUMIDITY Dry Mod ttiong Submitted? Y /N PROJECT INSP: LARRY DAVIS AVERAGE FIELD FORCE NAME OF NON-MANUAL MANUAL REMARKS CONTRACTOR/SUBCONTRACTOR VISITORS TIME REPRESENTATIVE REPRESENTING REMARKS EQUIPMENT AT THE SITE: CONSTRUCTION ACTIVITIES: r n cm A Prdi", - F;eSdevuce t/kr / t h J RakrcP Gaul c,& lef eva ct-t to cA j41 s 9si��v�/,C SIGNATURE ENGINEERING INSPECTOR