DR1201-CR131015 T H E • G 1 T Y O F
COPPELL
s,_ o
A s J . ' a DAILY CONSTRUCTION REPORT
PROJECT: CREEKVIEW DR RETAINING
WALL&ROADWAY DATE I o iI 1 REPORT#
IMPROVEMENTS f'
DAY jM I(Yw IT IF Is � S
PROJECT NO. DR 12-01
WEATHER SUN CLEAR OVERCAST SNOW
OWNER: CITY of COPPELL TEMP To 32 32-50 �i 70-85 85 up
WIND Still High Overtime Form
CONTRACTOR: FAIN GROUP HUMIDITY Dry Mod ttiong Submitted? Y /N
PROJECT INSP: LARRY DAVIS
AVERAGE FIELD FORCE
NAME OF NON-MANUAL MANUAL REMARKS
CONTRACTOR/SUBCONTRACTOR
VISITORS
TIME REPRESENTATIVE REPRESENTING REMARKS
EQUIPMENT AT THE SITE:
CONSTRUCTION ACTIVITIES:
r n cm A Prdi", - F;eSdevuce t/kr / t h J
RakrcP
Gaul c,& lef eva ct-t to cA j41 s 9si��v�/,C
SIGNATURE
ENGINEERING INSPECTOR