DR1201-CR131018 dômaI
" s DAILY CONSTRUCTION REPORT
PROJECT: CREEKVIEW DR RETAINING
WALL&ROADWAY DATE /�0/2(fl REPORT#
IMPROVEMENTS DAY I M T W TI O j S SI
PROJECT NO. DR 12-01
WEATHER SUN CLEAR 4SERC.XS3a RAIN SNOW
OWNER: CITY of COPPELL TEMP To 32 32-50 ilSIM 70-85 85 up
WIND Still od High Overtime Form
CONTRACTOR: FAIN GROUP HUMIDITY Dry Mod Humid Submitted? Y /N
PROJECT INSP: LARRY DAVIS
AVERAGE FIELD FORCE
NAME OF NON-MANUAL MANUAL REMARKS
CONTRACTOR/SUBCONTRACTOR
VISITORS
TIME REPRESENTATIVE REPRESENTING REMARKS
EQUIPMENT AT THE SITE:
CONSTRUCTION ACTIVITIES: (ri-
"1 ?
Riorrhoj s N dc/ pi
a ar T
SIGNATURE
ENGINEERING INSPECTOR