Loading...
DR1201-CR131023 T H E C 1 T Y O F COPPELL X A 9 S • ' m DAILY CONSTRUCTION REPORT PROJECT: CREEKVIEW ROADWAY AINING WALL DATE Ad/n / a)3 REPORT# IMPROVEMENTS DAY M IT I& IT IF IS IS PROJECT NO. DR 12-01 v WEATHER SUN 'E OVE: ST RAIN SNOW OWNER: CITY of COPPELL TEMP To 32 IgCl 70-85 85 up WIND Still High Overtime Form CONTRACTOR: FAIN GROUP HUMIDITY Dry Humid Submitted? Y N PROJECT INSP: LARRY DAVIS AVERAGE FIELD FORCE NAME OF NON-MANUAL MANUAL REMARKS CONTRACTOR/SUBCONTRACTOR VISITORS TIME REPRESENTATIVE REPRESENTING REMARKS EQUIPMENT AT THE SITE: CONSTRUCTION ACTIVITIES: caK-hvoote r pc fil can c r c 'te g.41,7 .44441 ri'!sv wdyrkhV? d4 sa6q� eXcd✓ath c S4'j4c-of-bri4 . 9 SIGNATURE ENGINEERING INSPECTOR