DR1201-CR131023 T H E C 1 T Y O F
COPPELL
X A
9
S • ' m DAILY CONSTRUCTION REPORT
PROJECT: CREEKVIEW
ROADWAY AINING
WALL DATE Ad/n / a)3 REPORT#
IMPROVEMENTS
DAY M IT I& IT IF IS IS
PROJECT NO. DR 12-01 v
WEATHER SUN 'E OVE: ST RAIN SNOW
OWNER: CITY of COPPELL TEMP To 32 IgCl 70-85 85 up
WIND Still High Overtime Form
CONTRACTOR: FAIN GROUP
HUMIDITY Dry Humid Submitted? Y N
PROJECT INSP: LARRY DAVIS
AVERAGE FIELD FORCE
NAME OF NON-MANUAL MANUAL REMARKS
CONTRACTOR/SUBCONTRACTOR
VISITORS
TIME REPRESENTATIVE REPRESENTING REMARKS
EQUIPMENT AT THE SITE:
CONSTRUCTION ACTIVITIES:
caK-hvoote r pc fil can c r c 'te g.41,7 .44441
ri'!sv wdyrkhV? d4 sa6q� eXcd✓ath c S4'j4c-of-bri4 .
9 SIGNATURE
ENGINEERING INSPECTOR