Loading...
Shadow Woods-CS 890907 (2) SEP Ot, 'E9 14: 17 I'T MLE'i'-HORN - DALLAS 779 P0-7' ,: :iT (tr;f..., UEVELOPMENT PERMIT FERMI 0 V Tne Gty Witn &ra oahA f�.iwe a�..7e Sep 2 0 699 if ...-§ 7aCoal. ..6 PROPERTY stI PLAIN FLOODPLAIN STATE OF TEXAS . COUNTY OF DALLAS . CITY Of - COPPELL : /ku TL.arl Ma,e.-1---7 Co.,s it,it., L.: rs. -for NAME OF PERMITTEE: ' • e . A1 -01 Se . • �J. Shtidok• w'oeye/s / The above named permittee applied for a DEVELOPMENT PERMIT on /..S/44 fes - The application has been reviewed by the ADMINISTRATOR and it is his determination thAt the proposed development IS located within an identified flood plain of Co t ton w eo 13 vaK The ADMINISTRATOR has reviewed plane and specifications of the proposed development for ; conformance with the development standards required by COPPELL flood plain management regulations. gYou are hereby asutthorizedv�tol�proceed with the following described work: i.OA the following described property: ZI o GS00 Acres / '' 7L4 7- T e,/,-, V GS �ur^✓e / /4S�v�C/ / J i. i, i --C-11 Ce' , - / D ilea-3 0(/fr7 /1 e 4s To maintain compliance with the development standards of COPPELL flood plain management -:- -regulations and to eliminate or minimize flood damage potential to the proposed development. you-are hereby'directed to construct your proposed development in accordance with the,; , • -4 following special provisions: (X ) For residential structures, the lowest floor (including basement) dust be elevated to //%%\\ two (2) feet above the 100-year base flood elevation. Minimum finished floor elevations must be shown on the plat for the development as approved by the City Engineer. N A ( ) or flood proofed ofed non-reeidential two structures, lowest the floor 100-yearu base basement) must be el nimd p ' Minimum finished floor elevations must be shown on the plat or site plan es approved ,by the \_ City Engineer. (X) Permittee must submit a certification from a registered professional engineer, architect, or land surveyor that the finished floor level of the residential structure has been constructed two (2) feet above the 100-year bas* flood elevation. AA ( ) For non-residential floodproofing, a registered professional engineer or architect must certify that the floodproofing methods are adequate to withstand the flood depths, pressures, velocities, impact and uplift forces and other factors associated with the base flood. (X) For fill activities, the permittee must submit a certification from an engineer ' or land d((- surveyor that the level of the compacted fill material is at or above the elevation of the Base Flood. ()() Provide a certified copy of all final plans or As-Built Drawings to the ADMINISTRATOR. ( `) OTHER PROVISIONS: /-a ' `1 -2 8'' , CK .` EDG;41 a OF CO'IITIONS B PE RMITTEE ATE r " SIGNATURE OF ADMINISTRATOR DATE