CF-Cozby Library-LR 940526J G EOTECHNICAL
E GEE Consultants, inc.
2540 Glenda Lane · Suite 108 · Dallas, -I'exas 7522~ · (214) 620-9791 · [ax (214) 620-9794
REPORT OF CONCRETE MIX INSPECTION
Report Date: May 26, 1994 Date Concrete Placed: May 19, 1994 Standard 6'x12"
Client: City of Coppell Area 28.27 Square Inches
Project: W.T. Cozby Public Library
Contractor: Diversified Construction Services, Inc.
Con¢~t¢ Supplier and Plant: Texas Industries, Inc. - Plant #41
LoeationofPlaeement: Exterior Grade Beams (2.6-B.8)
MATERIALS ~=., sD ~,,~',~. INSPECTION DATA
Dcscri?ion {Lbs/CuYd)
Mix Number: 45 Time Sample Batchcd: 11:44 am
Cement: Time Sampled: 12:30 pm
Sample Location: GB2 (A.5-6,7)
Fl)' Ash: Truck/Ticket No: 475/218336
Coarse Aggregate: I'C.S. Temperature:
Intermediate Aggregate: Ambient Range: 84°F
Fine Aggregate: Concrete Range: °F
Admixtures: Slump Range (inches)
Weather Conditions: Clear
I ADMLX Time Started: 11:45 am
2 Time Completed: 1:45 pm
Added Water: Sample Air Content (%): No Test
Total Cubic Yards Placed: 20.0
Required Strength (Lbs./sq.in.): 3,000
$~n M~m~ A~ ~ T~I ~ Compm~si~ St~ R~r~
N~r S Itan~ ~M. ~ {~)~, ~s~ ,L~. ~ gLO.. Sq. ~. ~
WTC 51 5½ 7 05/26/94 82,760 2,930
WTC 52 5½ 7 05/26/94 81,080 2,870
WTC 53 5½ 28 06/16/94
WTC 54 5½ 28 06/16/94
WTC 55 5% Hold
T~t Method:; L'til~ Fm~ Reg~r Cylinders Made By: V.M.
A~M C-31.C-39.C-]~ 'Un~s~ N~ ()~'i~{
Remarks and/or Dist~bution:
cc: Gary Sieb - City of Coppell Larry Davis - City of Coppell
Mike Sherpinskas - Diversified Construction Services, Inc.
Jim Bullock - F & S Partners / / ~
Russell Williams - Brockette Davis Drake, Inc..~ /~ //
Gl~l~o~Sultallts,~C. RevieN~by: Y~~
All le~ter$ and r~port$ a~ for th~ eacclu~iv~ u~ of th~ client to whom ~ a~ add~aaed ant sbeil nm be mprodm:ed ~iflaou~ the full approval etr GEE Consultants. lac. TI~ us~ of our nan~ must n~eiv~
our prior writ~-n a.t~atx:n, al. Our I¢lt~m and mOo~s apply only to ga~ sampi~ ~zt avzUor iml:a~d anti am n~ ~ indicativ~ of tha .au~fili~ of appa~nuly, idm'aicat or similar Woducu.