Loading...
CF-Cozby Library-LR 940510PIER INSPECTION REPORT Report Date: May 10, 1994 Inspection Date: May 9, 1994 Client: City of Coppell Project: W.T. Cozby Public Library Identification: Straight Shaft Piers Method of Test: Vistlal Inspection Depth to Pier Shaft Bearing Req'd Actual Total Bearing Casing # Size Strata Pent. Pent. Depth Material Depth Remarks J-2.2 18" 19' 6" 6' 0" 9' O' 28' 6 Gray Shale 18' 3" 2~,~'' of water, plumb, clean D-2 24" 17' 0' 5' 0' 6' 0" 23' 0" Gray Shale 16' 11" Clean, plumb, dry G-2.2 24' 19' 10" 10' 0" 11' 2" 31' 0" Gray Shale 17' 8" Clean, plumb, dry L-7.5 18" 15' 5" 10' 0" 10' 10" 26' 3" Gray Shale 14' 9" Clean, plumb, dr)' L-6.5 18" 16' 0" 10' 0" 9' 6" 25' 6' Gray Shale 17' 2" 2" of water, plumb, clean K-7.8 18' 16' 1" 10' 0" 10' 0" 26' 1" Gray Shale 14' 4" ~.~" of water, plumb, clean K-6.5 18" 15' 3" 10' 0" 9' 7" 24' 10" Gray Shale 16' 9" ~h" of water, plumb, clean K-7.5 18" 16' 0" 10' 0" 10' 3" 26' 3" Gray Shale 17' 0" ~.6" of water, plumb, clean K-6 18' 15' 1' 10' 0" 10' 9" 25' 10" Gray Shale 16' 9" ~" of water, plumb, clean cc: Gary Sieb - City of Coppell Mike Sherpinskas - Diversified Construction Jim Bullock - F & S Partners Russell Williams - Brockette Davis Drake repons apply' only to th: sample tested and:or inspe~--ted, and am no~ re, cessarily indicati,~ of th~ quantities of apparently identical or similar products.