Loading...
MA1009-CS120410 1100 Macon Street Fort Worth, Texas 76102 Phone 817.336.5773 Fax 817.336.2813 www.tnp-online.com MEETING MINUTES MEETING MINUTES Weekday: Tuesday Date: 4/10/2012 Time of Meeting: 9:00 am Proj. No.: CPL 11185 Andy Brown Erosion Improvements Project Name: Ph-1 (Central Activity Lake) Subject: Kickoff Meeting PRESENT AT Brad Reid, City Guy McLain, City MEETING: Keith Marvin, City Kevin Price, City John Elias, City Kyle Dykes, TNP Tim May, TNP DISTRIBUTION: Same as Above Chris Schmitt, TNP PREPARED BY: Kyle Dykes, TNP DATE OF REPORT: 4/10/2012 The following summation represents our interpretation of the items discussed at the referenced meeting. Any persons desiring t correct the minutes are requested to put their comment in writin of the report. Otherwise the minutes will stand as written. This meeting served as the kickoff meeting for designing erosion impr. Additional discussion items arose regarding Alex Canal, the boar Parkway Blvd. The following is a summary of the meeting discussion items and associated Central Activity Lake -Kyle presented a brief summary of the contracted scope of work, and most notable improvement features. This includes conceptual, preliminary, and final design for the following: combination of lake edge treatments, outfall eros pedestrian bridge repairs and stabilization, and fishing pier connection im -TNP will include a conceptual evaluation of replacing the pedestrian bridge as opposed to salvag the existing bridge. -The Andrew Brown Park Master Plan study is ongoing, concurrent w coordinate with Dunaway regarding the west side of the lake. Conceptual ideas include having an event center stage (possibly concrete) that projects over the western lake shore. -Concept design should evaluate removing and/or relocating the fi -TNP to consider improvements to stabilize the turf around the high traffic picnic area at the southwest corner of the lake. -TNP will evaluate safety conditions associated with the lake out ducks that may be overtaken by the vortex. Page 1 1100 Macon Street Fort Worth, Texas 76102 Phone 817.336.5773 Fax 817.336.2813 www.tnp-online.com -A Section 404 Nationwide Permit (NWP) is anticipated for this project. However, the contract includes scope for an Individual Permit if needed. A Notice of Intent (NOI) to the USACE will be required, including evaluation of environmental mitigation. Ult will -The anticipated project schedule is as follows: nd April 2 Notice to Proceed letter o th May 25 Survey and Concept Design (30%) complete (40 days) o th June 8 City 30% review complete (10 days, est.) o th July 20 Preliminary Design (60%) complete, and submit NOI to USACE (30 days) o rd August 3 City 60% review complete (10 days) o st August 31 90% Design complete (20 days) o th Sept 14 City 90% review complete (10 days) o th October 5 Final Design (100%) complete (15 days) o - The Notice to Proceed letter states the project will be complete in 90 days schedule above, which corresponds with the contract but is more Boardwalk thth -TNP to present boardwalk demolition plans to the City by April 3 in order to have it on the May 7 Park Board meeting agenda. This should include concept level visual aids of the proposed improvements for presentation to stakeholders. -Include removal of existing helical piers in high erosion areas to avoid safety risk of protruding objects being exposed by erosion. TNP will evaluate removing al first choice approach. -City anticipates performing the demolition work without needing -TNP will consider accommodating fishing, and other non-pass through traffic along the boardwalk, as part of the design. -TNP to design improvements for the eroded storm drain outfall as part of this project. The additional scope will be added to the Andrew Brown (East) Erosio Phase 2 contract proposal. -TNP will evaluate the need for upsizing the lake level control p waters recede. Alex Canal -Keith suggested bidding the Alex Canal improvements with the Cen order to realize economy of scale savings. -Concept plans and cost opinions are higher than available funds. North Canal (Parkway Blvd. to spillway) -TNP to prepare a stand-alone contract proposal to design bank improvements for both sides of the channel/canal (approximately 450 lf) between Parkway Blvd. and the existing spillway to the north. Get proposal to Keith ASAP. -Assume survey will be done concurrent with central activity lake event survey is done separately. Page 2 1100 Macon Street Fort Worth, Texas 76102 Phone 817.336.5773 Fax 817.336.2813 www.tnp-online.com -Assume a hard edge on both sides of the canal that will match the appearance of surr improvements. -Central lake funding is tied to trail improvements. Minor trail Parkway Blvd., which may impact funding options for this portion of canal. -The canal improvements may impact the spillway improvements. East Lake -TNP to add scope to the proposal for adding a fishing pier to th -City will evaluate the current proposal and give comments to TNP on any changes or questions they have. Action items th -TNP to submit boardwalk demolition plans and concept visuals to -TNP to submit contract proposal for the north canal to City ASAP -City will evaluate the current East Lake contract proposal and give comments to TNP regarding any changes or questions they have. Page 3