Loading...
MA1009-MP120731T H E C 1 T Y O F JUANDY BROWN PARK (EAST) EROSION CONTROL COFFELL INC. IMPROVEMENTS — CENTRAL ACTIVITY LAKE tea. k g a t o Project Status Report July 2012 posted on Dropbox. Let me know if you need additional information to To: Brad Reid make a final decision. - The City will review the Concept Plan From: Kyle Dykes, P.E., CFM and provide TNP with written markups and review comments to be Project: Andy Brown Park Erosion Control Improvements — incorporated into the Preliminary Central Activity Lake (CPL11185) Design. Pending. I can work off of the review meeting notes but hand This is the first monthly project status report on the above written markups will help ensure I referenced project. The following summarizes work that is interpret the desired intent. completed, underway, and /or planned for the near future. Please - TNP will evaluate the possibility of notify me if you have information that will affect the progress of reducing the lake edge depth to work reported on below. either 2' or 2.5'. Complete. Anything less than 3' deep water will have a CONCEPT DESIGN higher potential for vegetation A concept plan was submitted on 6/5/12 and subsequently growth. TNP recommends keeping reviewed by the City. A concept review meeting was held at the the wall height as is, and backfilling TNP Fort Worth office on 6/12/12, and meeting minutes were to create the desired depth. I'll plan distributed on 6/14/12. The status of each action item is included on showing 2' deep water on the below. Preliminary Plans. - TNP will get clarification from PRELIMINARY DESIGN Integrated Environmental Solutions, Preliminary design is currently underway. The geotechnical Inc. on the permitting details of a investigation is complete, and a PDF of the report is being land swap /reclamation in the submitted with this status report. A bound hard copy will be jurisdictional lake. Complete. See submitted with the preliminary design. The following is a status email dated 6/14/12. update on each action item from the concept review meeting minutes. Proiect Milestone Schedule Concept Review Meeting Action Items: ✓ Project Start Date ........... ........................... /M12 - TNP and Dunaway will coordinate with one another on any ✓ Survey and Concept Design ................... (0/12) items that may affect the others work. As needed. Attached ✓ City Review ........... ............................... (6/12/12) to this email is PDF of the geotech report. I'll include a bound Preliminary Design (60 %) ...................... 7/20/12 hard copy with the preliminary design submittal. 404 PCN Submittal ........ .......................(8 /2012) - The City will determine which fishing pier option to include in City Review ( 60%) ........ ............................W12 the Preliminary Design. Pending. Discussion at the review 90% Design .................... ........................8 /31/12 meeting favored rehabbing the pier in- place. Please verify. City Review (90 %) ......... ........................9 /14/12 Final Design ( 100% ) .............................. 10/5/12 - TNP will send a PDF of the entire Andy Brown Feasibility Study (2008) to meeting attendees. Complete ( ) Indicates a revised date from the kickoff - TNP will send project photos and literature to meeting meeting schedule. attendees regarding MagnumStone'" and RediRock'" block wall systems. Complete. Via email dated 6/14/12, and files Page 1 of 1