MA1009-MP120731T H E C 1 T Y O F
JUANDY BROWN PARK (EAST) EROSION CONTROL COFFELL
INC. IMPROVEMENTS — CENTRAL ACTIVITY LAKE tea.
k g a t o
Project Status Report July 2012
posted on Dropbox. Let me know if
you need additional information to
To: Brad Reid
make a final decision.
- The City will review the Concept Plan
From: Kyle Dykes, P.E., CFM
and provide TNP with written
markups and review comments to be
Project: Andy Brown Park Erosion Control Improvements —
incorporated into the Preliminary
Central Activity Lake (CPL11185)
Design. Pending. I can work off of
the review meeting notes but hand
This is the first monthly project status report on the above
written markups will help ensure I
referenced project. The following summarizes work that is
interpret the desired intent.
completed, underway, and /or planned for the near future. Please
- TNP will evaluate the possibility of
notify me if you have information that will affect the progress of
reducing the lake edge depth to
work reported on below.
either 2' or 2.5'. Complete. Anything
less than 3' deep water will have a
CONCEPT DESIGN
higher potential for vegetation
A concept plan was submitted on 6/5/12 and subsequently
growth. TNP recommends keeping
reviewed by the City. A concept review meeting was held at the
the wall height as is, and backfilling
TNP Fort Worth office on 6/12/12, and meeting minutes were
to create the desired depth. I'll plan
distributed on 6/14/12. The status of each action item is included
on showing 2' deep water on the
below.
Preliminary Plans.
- TNP will get clarification from
PRELIMINARY DESIGN
Integrated Environmental Solutions,
Preliminary design is currently underway. The geotechnical
Inc. on the permitting details of a
investigation is complete, and a PDF of the report is being
land swap /reclamation in the
submitted with this status report. A bound hard copy will be
jurisdictional lake. Complete. See
submitted with the preliminary design. The following is a status
email dated 6/14/12.
update on each action item from the concept review meeting
minutes.
Proiect Milestone Schedule
Concept Review Meeting Action Items:
✓ Project Start Date ........... ........................... /M12
- TNP and Dunaway will coordinate with one another on any
✓ Survey and Concept Design ................... (0/12)
items that may affect the others work. As needed. Attached
✓ City Review ........... ............................... (6/12/12)
to this email is PDF of the geotech report. I'll include a bound
Preliminary Design (60 %) ...................... 7/20/12
hard copy with the preliminary design submittal.
404 PCN Submittal ........ .......................(8 /2012)
- The City will determine which fishing pier option to include in
City Review ( 60%) ........ ............................W12
the Preliminary Design. Pending. Discussion at the review
90% Design .................... ........................8 /31/12
meeting favored rehabbing the pier in- place. Please verify.
City Review (90 %) ......... ........................9 /14/12
Final Design ( 100% ) .............................. 10/5/12
- TNP will send a PDF of the entire Andy Brown Feasibility
Study (2008) to meeting attendees. Complete
( ) Indicates a revised date from the kickoff
- TNP will send project photos and literature to meeting
meeting schedule.
attendees regarding MagnumStone'" and RediRock'" block
wall systems. Complete. Via email dated 6/14/12, and files
Page 1 of 1