MA1009-MP120817ANDY BROWN PARK (EAST) EROSION CONTROL
9!17. IMPROVEMENTS - CENTRAL ACTIVITY LAKE
T H E C 1 T Y O F
COPPELL
T p
Project Status Report August 2012
- City will select a wall system for
preliminary design. TNP will provide
To: John Elias
additional data upon request. See
attached Pavestone information for
From: Kyle Dykes, P.E., CFM
your consideration.
- TNP will prepare a contract
Project: Andy Brown Park Erosion Control Improvements —
amendment for Alex Canal to extend
Central Activity Lake (CPL11185)
the project north of Parkway.
Coming soon.
The following summarizes work completed since last month's
The schedule will be revised accordingly
status update.
once a wall type is determined, as this
will affect when preliminary design will be
PRELIMINARY DESIGN
complete.
A project coordination meeting was held on August 2nd at City
Proiect Milestone Schedule
offices. Issues identified at the concept review meeting were
✓ Project Start Date ...................................... /Ml2
further discussed, and new action items assigned. The most
✓ Survey and Concept Design ................... (0/12)
notable item being, which wall type to include in the preliminary
✓ City Review ........... ............................... (6/12/12)
design? The following is a listing of the action items, along with
Preliminary Design (60 %) ...................... 7120112
any progress to date.
404 PCN Submittal ............................... (s/2o12)
Coordination Meetine Action Items:
City Review ( 60%) ........ ............................W12
- TNP will evaluate the Pavestone large block system and
90% Design .................... ........................$ /31/12
provide feedback. Complete. Attached are a typical section,
City Review (90 %) ......... ........................9 /14/12
product literature, and photos of the Diamond Pro block. We
Final Design ( 100% ) .............................. 10/5/12
have confirmed that this product and construction method
(no tie - backs) will work for the Central Lake and Alex Canal.
() Indicates a revised date from the kickoff
meeting schedule.
- TNP will verify any requirements for railing, and provide
additional direction. Ongoing. Initial research does not
indicate railing is required along the lake or canal. TNP will
provide a formal recommendation upon further research and
consideration.
Page 1 of 1