MA1009-MP120817ANDY BROWN PARK (EAST) EROSION CONTROL 9!17. IMPROVEMENTS - CENTRAL ACTIVITY LAKE T H E C 1 T Y O F COPPELL T p Project Status Report August 2012 - City will select a wall system for preliminary design. TNP will provide To: John Elias additional data upon request. See attached Pavestone information for From: Kyle Dykes, P.E., CFM your consideration. - TNP will prepare a contract Project: Andy Brown Park Erosion Control Improvements — amendment for Alex Canal to extend Central Activity Lake (CPL11185) the project north of Parkway. Coming soon. The following summarizes work completed since last month's The schedule will be revised accordingly status update. once a wall type is determined, as this will affect when preliminary design will be PRELIMINARY DESIGN complete. A project coordination meeting was held on August 2nd at City Proiect Milestone Schedule offices. Issues identified at the concept review meeting were ✓ Project Start Date ...................................... /Ml2 further discussed, and new action items assigned. The most ✓ Survey and Concept Design ................... (0/12) notable item being, which wall type to include in the preliminary ✓ City Review ........... ............................... (6/12/12) design? The following is a listing of the action items, along with Preliminary Design (60 %) ...................... 7120112 any progress to date. 404 PCN Submittal ............................... (s/2o12) Coordination Meetine Action Items: City Review ( 60%) ........ ............................W12 - TNP will evaluate the Pavestone large block system and 90% Design .................... ........................$ /31/12 provide feedback. Complete. Attached are a typical section, City Review (90 %) ......... ........................9 /14/12 product literature, and photos of the Diamond Pro block. We Final Design ( 100% ) .............................. 10/5/12 have confirmed that this product and construction method (no tie - backs) will work for the Central Lake and Alex Canal. () Indicates a revised date from the kickoff meeting schedule. - TNP will verify any requirements for railing, and provide additional direction. Ongoing. Initial research does not indicate railing is required along the lake or canal. TNP will provide a formal recommendation upon further research and consideration. Page 1 of 1