MA1009-EM121116tnpO teague real & prerkins Opinion of Probable Construction Cost Client: City of Coppell Date: 16- Nov -12 Project: Alex Drive Canal - Erosion Control Improvements Prepared By: KJD tnp no.: CPL11248 Checked By: Title: UNIT I - Canal from 435' north of Parkway Blvd. to 700' south of Parkway Blvd. Sheet: 1 of 2 Spec No. Item Item Description Quantity Unit Unit Cost Item Cost 1 Mobilization and Site preparation (incl. work platform) 1 LS $50,000.00 $ 50,000 2 Dewatering /Pumping to drain canal 1 LS $10,000.00 $ 10,000 3 Embankment for work platform 2,000 CY $15.00 $ 30,000 4 Remove existing stone wall 700 LF $10.00 $ 7,000 5 Unclassified Channel Excavation 1,150 CY $20.00 $ 23,000 6 Modular Block Wall (Pavestone Diamond Pro Stone Cut) 10,100 SF $32.00 $ 323,200 7 Safety Rail 650 LF $50.00 $ 32,500 8 GeowebO (erosion protection in alley) 41 SY $70.00 $ 2,870 9 Concrete Toe -Wall (8 "x48 ") 60 LF $80.00 $ 4,800 10 Rock Rip -Rap 225 CY $90.00 $ 20,250 11 SWPPP 1 LS $10,000.00 $ 10,000 12 Project Stabilization 1,560 SY $4.50 $ 7,020 Subtotal $ 520,640 Contingencies (15 %) $ 78,096 Base Total $ 599,000 No Design Completed E Preliminary Design Final Design N, t n p o teagUe nail & perkins Opinion of Probable Construction Cost Client: City of Coppell Date: 16- Nov -12 Project: Andy Brown Park (East) - Erosion Control Improvements Prepared By: KJD tnp no.: CPL11185 Checked By: Title: UNIT II - Central activity lake and canal below spillway Sheet: 2 of 2 Spec No. Item Item Description Quantity Unit Unit Cost Item Cost 1 Mobilization and Site preparation 1 LS $75,000.00 $ 75,000 2 Dewatering /Pumping to lower lake level 1 LS $50,000.00 $ 50,000 3 Unclassified Channel Excavation 3,500 CY $20.00 $ 70,000 4 Modular Block Wall (Pavestone Diamond Pro Stone Cut) 17,490 SF $32.00 $ 559,680 5 Safety Rail 295 LF $50.00 $ 14,750 6 GeowebO (west lake edge treatment) 790 SY $70.00 $ 55,300 7 Concrete Toe -Wall (8 "x48 ") 57 LF $80.00 $ 4,560 8 4" Reinforced Concrete Riprap (incl. sidewalk) 1,250 SF $10.00 $ 12,500 9 6" Reinforced Concrete Riprap (for spillway side slopes) 135 SF $10.00 $ 1,350 10 Rock Rip -Rap 40 CY $90.00 $ 3,600 11 Fishing pier rehab - railing and pontoons 1 LS $8,000.00 $ 8,000 12 SWPPP 1 LS $10,000.00 $ 10,000 13 Project Stabilization 12,500 SY $4.50 $ 56,250 Subtotal $ 920,990 Contingencies (15 %) $ 138,149 Base Total $ 1,060,000 No Design Completed [�✓ Preliminary Design Final Design