MA1009-MP121221t�., t wague nail & perkinS — Anpinc.com engineers surveyors landscape architects Project Status Report To: John Elias and Keith Marvin From: Kyle Dykes cc: Tim May Date: December 21, 2012 RE: Andy Brown Erosion Phl & Alex Drive Canal - 90% Coordination Questions (CPL11185 & CPL11248) We have proceeded with preparing 90% plans and are getting close to another submittal. The primary difference on the plans will be additional details that were not included at 60 %. A bulk of my time this week has been spent preparing spec's and evaluating schedules. In an effort to meet the stringent schedule listed on item 3, please provide any feedback you may have on the following items. 1) Is the City interested in offering an incentive /disincentive schedule for this project? If so, please consider the following: a. How much time does the City need to prep the park for the Spirit of Coppell celebration? b. What is the drop dead date for the contractor to be cleared out of Andy Brown Park? c. Could work continue south of Parkway Blvd. after the event? This may be necessary depending on when the notice to proceed is issued. d. I think it will take three Units to address the funding source requirements and an incentive plan. For instance, Unit I -A (Lake and spillway), Unit I -B (north canal), and Unit II (south canal). Parks could then pay for Unit I -A, and Engineering could pay for Unit I -A and Unit II. In this case the incentive /disincentive could be contingent on completing Unit's I -A and I -B either before or after a certain date ... say June 15th, and then the south canal could be completed before or after the event but with no association to the incentive schedule. 2) Could the large east lake (Moore Lake) be used for possible storage and recharge volume during and after construction? Since construction will be completed so close to the Spirit of Coppell celebration, it will be desirable to have the central activity lake full and functional again. Here are a few considerations: a. If the east lake is low at the time construction begins, the contractor could pump from the central lake to the east lake... essentially storing the water for later recharge. b. The east lake may have potential for a higher normal pool (more storage) with a few temporary modifications (i.e. sheet pile barrier, etc...). This has not been evaluated yet but may be an option. c. Do you foresee a problem with lowering the east lake 2' or 3' below normal pool to recharge the central lake prior to Spirit of Coppell? d. It may be possible to follow Ph1 construction with Ph2, where any lowering of the east lake would benefit Ph2 construction. e. One of the TCEQ water rights permit specialists is looking into whether we could do a one time recharge out of Denton Creek. It may be that discharging the central lake into the creek initially will make such a permit possible. I'll let you know what I find out. Fort Worth -I 100 Macon Street- Fort Worth, Texas 76102 - 81 7.336.5773 dh Dallas - 17304 Preston Road, Suite 1340 - Dallas, Texas 75252 - 21 4.461.9867 Denton - 1517 Centre Place Drive, Suite 320 - Denton, Texas 76205 - 940.383.4177 O Sherman - 200 North Travis Street, Suite 500 - Sherman, Texas 75090 - 903.870.1089 3) In order to allow for sufficient construction time it is imperative that we advertise and bid ASAP. Allowing 3 months to complete Unit's I -A and I -B (everything north of Parkway) prior to June 15th, I anticipate the following bid /contract schedule. a. January 41h 90% Plans and Spec's b. January 23rd 100% Plans and Spec's c. January 271h I" Advertisement d. February 3rd 2nd Advertisement e. February 12th Open Bids f. February 18th Park Board "Special Session" g. February 22nd Pre - Council Package h. February 26th Council Meeting i. March 12th Notice to Proceed Attached to this memo are a few screen shots of the City's calendar with these dates highlighted. Action Items: • City to provide feedback or request coordination meeting regarding questions above. • TNP to proceed with 90% plans and spec's. • Page 2