From:Kyle Dykes <KDykes@TNPINC.com>
Sent:Tuesday, January 29, 2013 4:41 PM
To:Keith Marvin
Cc:John Elias
Subject:RE: Andy Brown & Alex Canal - Wall info
They will need to get it dried and compacted for construction. Being under water after construction shouldn’t be a
problem.
Not a problem on the Bid number. And I’ll add the CRDC president to the cover sheet. Thanks
Kyle Dykes, P.E., CFM
StormWaterGroup
1100 Macon Street
Fort Worth, Texas 76102
817.336.5773 Main
817.665.7171 Direct
kdykes@tnpinc.com
From: Keith Marvin [mailto:KMarvin@coppelltx.gov]
Sent: Tuesday, January 29, 2013 4:26 PM
To: Kyle Dykes
Cc: John Elias
Subject: RE: Andy Brown & Alex Canal - Wall info
Does the moisture in the channel present a problem here, or do you think we’ll be ok?
Keith Marvin, P.E.
City of Coppell
972-304-3681
From: Kyle Dykes [mailto:KDykes@TNPINC.com]
Sent: Tuesday, January 29, 2013 3:16 PM
To: Keith Marvin; John Elias
Subject: Andy Brown & Alex Canal - Wall info
I just spoke to Alan Starling and he is going to bring samples to John’s office tomorrow. Regarding the other two items:
1)Lead time – usually within 2 weeks, sometimes sooner. Color should not delay the turn-around.
2)Base pad compaction – 95% percent compaction is needed, as we have it specified. High moisture needs to be
either dried out or removed and replaced. However, the wall is expected to shift slightly with the soil, and the
structural backfill does a good job of holding the wall together.
1