Loading...
CF-Cozby Library-LR 940520 (04) REPORT OF IN-PLACE DENSITY AND MOISTURE OF SOIL Method: ASTM D2922 D3017 D698 Client: City of Coppell Material Description Maximum Optimum Dry Moisture Density Content Project: W.T. Cozby Library ~b.CCuVt) Percent Test Date: April 5, 1994 1. Select Fill: Reddish Brown Clayey Sand 112.5 13.2 Report Date: 1Slay 20, 1994 2. Required Density (%): 95% to 105% 3. Required Moisture (%): :1:3% Optimum 4. Mat Location/Elevation (and/or) Lift In-Place In-Place Percent No. Db' Density Moisture Compaction Test No. (Lbs/C-'uFO Content (%) Probe Depth 1 Building Pad Select Fill - pt Lift 16 107.1 15.5 95.2 6" 21' north and 21' west of southeast corner 1 Building Pad Select Fill - 1st Lift 17 114.0 15.6 101.3 6" 57' north and 42' west of southeast corner 1 Building Pad Select Fill o 1*t Lift 18 109.9 13.5 97.7 6" 51' west and 33' south of northeast corner 1 Building Pad Select Fill - 1st Lift 107.3 15.7 95.4 19 6" 100' west and 8' north of southeast corner 1 Building Pad Select Fill - 1s~ Lift 110.9 14.0 98.6 20 6" 100' west and 48' south of northeast corner Above Test Results Meet Specification Requirements cc: Gary Sieb - City of Coppell Mike Sherpinskas - Diversified Construction Service.s, Inc. Jim Bullock - F & S Partners Robert Williams - Brockette Davis Drake, Inc. Our letters and repons are for the exclusive use of the client Io whom they a~e add~sed. Th= u~e of our nam= mini re~ive our prior written approval. Our letters and reporqs appl) only to the sample teated and'or insr~--~ed, and a~ nc~ n=o=a~arily indicative of the quantities of appar=ntly identical or similar products.