Loading...
CF-Cozby Library-LR 940502GENERAL REPORT Report Date May 2, 1994 Inspection Date April 22, 1994 Client City of Coppell Project W.T. Cozby Public Library Coppell, Texas Identification Structural Steel Inspection - Field Method of Test Visual Results On this date a representative of GEE Consultants, Inc. was present at the above referenced project to perform a visual inspection of welded embeds. · On arrival at job site the project drawings and specifications were reviewed. We then proceeded to visually examine and test the 21 embeds piece mark #lA3 which are 5x3xaA'' angles 8" long with an 18" #3 rebar and two 2 aA "x5" long shear stud connectors welded in place. · The welds were visually examined for size and appearance on each piece and were found to be satisfactory. In addition the shear stud connectors were tested by random striking with a hammer and were found to be satisfactory. Our inspection was performed in accordance with project drawings and specifications. cc: Gary Sieb - City of Coppell Mike Sherpinskas - Diversified Construction Services, Inc. Jim Bullock - F & S Partners Russell Williams - Brockette Davis Drake, Inc.