Kimbel Vill-CS131031
DEVELOPMENT REVIEW COMMITTEE
ENGINEERING COMMENTS
ITEM:
PD-267-RBN, Kimbel Village, PD-267-RBN, Kimbel Village,
a zoning change
request from C (Commercial) to PD-267-RBN (Planned Development-267-
Residential Urban Neighborhood), to allow 24 multifamily units and 3,242 square
feet of office/retail uses on 0.7 acres of property located at the southwest corner
of Village Parkway and Kimbel Kourt, at the request of Sudkar Allada, being
represented by Greg Frnka.
STAFF REP.: Marcie Diamond PROJECT ID# PD-13-0066
DRC DATE:
October 31, 2013 and November 7, 2013
CONTACT:
Michael Garza, P.E., Asst. Director of Engineering, 972-304-7019
COMMENT STATUS: PRELIMINARY FINAL REVISED
AFTER P&Z
1. There will be additional comments during detailed engineering plan review.
2. Show all the adjacent property driveways, paving and label the distance to proposed
driveways and intersections.
3. Show the on-street parking on the utility plan.
4. The on-street parking will need to be maintained by the property owners and included
in a license agreement approved by council.
5. Where does the fire line loop to?
6. Provide traffic analysis.
7. ADA barrier free ramps will need to be provided at the intersection of Kimbel and
Village.
8. Stamped concrete at the driveway on Village Pkwy will need to be included.
DEVELOPMENT REVIEW COMMITTEE
ENGINEERING COMMENTS
ITEM:
Kimbel Addition, Lot 16R, Block A, Replat
, being a replat of lots 15 and 16
of the Kimbel Addition to allow multifamily and office/retail uses on 0.7 acres of
property located at the southwest corner of Village Parkway and Kimbel Kourt,
at the request of Sudkar Allada, being represented by Greg Frnka.
STAFF REP.: Marcie Diamond PROJECT ID# RPNR-13-0067
DRC DATE:
October 31, 2013 and November 7, 2013
CONTACT:
Michael Garza, P.E., Asst. Director of Engineering, 972-304-7019
COMMENT STATUS: PRELIMINARY FINAL REVISED
AFTER P&Z
1. There will be additional comments during detailed engineering plan review.
2. Include the vault and meters in a utility easement.
3. Why is there a drainage easement on the north side?
4. Is there a fire lane/mutual access easement?
5. The plat is crowded; it needs to be cleaned up.
6. If parking the on-street is provided then a sidewalk easement will be needed.