Loading...
Gateway BP(3.1)-CS131031 DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS ITEM: Gateway Business Park No. 3, AAA, Lot 1R, Block A, Site Plan Amendment, to allow a 10,790-square-foot addition to the two existing buildings to combine into an 248,980-square-foot, two-story office; to add an enclosed service area and to revise the parking and landscaping on 18.07 acres of property located at the northwest corner of Freeport Parkway and IH 635, at the request of SP4 750 Canyon, LP, being represented by Erik M. Hauglie, P.E., Pacheco Koch Consulting Engineers. STAFF REP.: Gary Sieb PROJECT ID# SPR-13-0075 DRC DATE: October 31, 2013 and November 7, 2013 CONTACT: Michael Garza, P.E., Asst. Director of Engineering, 972-304-7019 COMMENT STATUS: PRELIMINARY FINAL REVISED AFTER P&Z 1. There may be additional comments during detailed engineering plan review. 2. Is there any interest in putting up escrow for a traffic signal? DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS ITEM: Gateway Business Park No. 3, AAA, Lot 1R, Block A, Replat, being a replat of Lots 1 & 2, Block A, to combine the two lots into one and to revise existing fire lanes and easements to allow a revised site plan to accommodate a 248,980- square-foot building on 18.07 acres of property located at the northwest corner of Freeport Parkway and IH 635, at the request of SP4 750 Canyon, LP, being represented by Erik M. Hauglie, P.E., Pacheco Koch Consulting Engineers. STAFF REP.: Gary Sieb PROJECT ID# RPNR-13-0076 DRC DATE: October 31, 2013 and November 7, 2013 CONTACT: Michael Garza, P.E., Asst. Director of Engineering, 972-304-7019 COMMENT STATUS: PRELIMINARY FINAL REVISED AFTER P&Z 1. There may be additional comments during detailed engineering plan review. 2. Is there any interest in putting up escrow for a traffic signal?