Loading...
CF-Cozby Library-LR 940523 (2)E GEE Consultants, Inc. 2540 Glenda lane · Suite 10g · Dallas, Texas 75229 · (214) 620-9791 · Fax (214) 620-9794 GENERAL REPORT Report Date May 23, 1994 Inspection Date May 20, 1994 Client City of Coppell Pr~ect W.T. Cozby Library. Coppell, Texas Identification Reinforcing Steel Inspection Method of Test Visual Inspection Resu[t~ On this date. May 29, 1994, a representative of GEE Consultants. Inc. was present at the above referenced site to visually inspect the Grade Beams at the tbllowing locaitons: Grade Beams 14, 4, 18, 10. 9, 17. 6, 3 and 7 between grids C-12 to J.4-7.8 The tbllowing discrepancies were noted and brought to the attention of Charlie, a representative of J.L. Burney Construction Company. i. Improper spacing of stirrups 2. Missing #9 bar in bottom of GB-19 3. Dirty pier tops The above discrepancies were corrected as noted. Technician: K.Mc. cc: Ga~' Sieb - City of Coppell Larry Davis - City of Coppell Mike Sherpinskas - Diversified Construction Services, Inc. Jim Bullock - F & S Partners Russell Williams - Brockette Davis Drake, Inc.