Loading...
DR1201-LR131101 (2) NOV-03-2013 23:32 P.14/15 Texas C T, Inc. ATA Construction Materials Testing GEE Consultants Inc and Environmental Consulting P 10044 Monroe Drive • Dallas, Texas 75229 • (214) 352-6957 • Fax (214) 352-6972 • www .texascmt.com • MOISTURE DENSITY RELATIONSHIP REPORT Test Report Date: November 1, 2013 Project No: 213-0134 • Client: City of Coppell Moisture Report No. 10 Sample Date: October 9, 2013 Project: Creekview Drive Roadway Improvements 2013, Coppell, Texas Identification: Moisture Density Relationship Test Procedure: ASTM D698 Test Results: Method A Optimum Moisture Content 12.9 percent Maximum Density 117.1 pounds per cubic foot Rammer Type Manual Material Description Orange Silty Sand with Sandstone Fragments and Occasional Gravel Material Origin Northside Sidewalk Subgrade Moisture Preparation Procedure Air Dry Liquid Limit Non-plastic Plastic Limit Non-plastic Plasticity Index (PI) Non-plastic Percent Passing No. 200 U.S. Sieve 28 cc: Mr. Larry Davis -City of Coppell, Phone: 972-304-3684; via Fax: 972-304-3570 Mr. George Marshall -City of Coppell, Phone: 972-304-3562; via E-mail: gMarshall@coppelltx.gov Mr. Rod Lacy- The Fain Group,Phone: 817-927-4388; via E-mail: rlacy @faingp.com Texas.CMT, Inc. TBPE Firm: F-4521 Reviewed by: • Our letters and reports are for the exclusive use of the client to whom they are addressed. The use of our name must receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed,and are not necessarily indicative of the quantities of apparently identical or similar products.